Montageanleitung /
Installation manual
MBN GmbH, Balthasar-Schaller-Str. 3, 86316 Friedberg - Germany
www.proled.com
Installation:
1. Please take care about following points before installation
Installation only from both sides allowed.
At length over 2m only 2 person
Do not install from one side
for installation allowed.
2. Please take care about following points before deinstallation
Please be carefull at deinstallation. Do not pull at light
At length over 2m only 2 person
for deinstallation allowed.
3. Connection diagramm
Installation and commissioning may only be performed by qualified
persons.
National installation regulations must be observed.
Luminaires must be disconnected from mains before any work.
4. Replacement of the included light source
Principle, the built-in light source can be replaced by a trained electrician without permanent damage to the
containing product. Generally available tools are sufficient.
PSU 24V