![ProfiTap X2-3200G Product Manual Download Page 5](http://html1.mh-extra.com/html/profitap/x2-3200g/x2-3200g_product-manual_1611202005.webp)
1
INSTALLATION
1. UNPACKING & INSTALLATION
1.1 Unpacking
Carefully unpack all the items supplied with the
X2-3200G
and retain the packaging
for later use:
◉
1 x X2-3200G main unit
◉
2 x C13 AC power cord
◉
1 x RJ45 9-pin female serial adapter
◉
1 x Rack mounting kit (including front & rear brackets and the necessary screws)
◉
Quick Start Guide
▶
Note:
Please contact the supplier if any part is missing or damaged.
1.2 Installation as Standalone
The unit can be installed as a stand-alone unit.
To ensure proper heat dissipation and ventilation, leave at least 15 cm (6 inches) of
space behind the unit and 5 cm (2 inches) in front.
1.3 Installation in a Rack
The unit can be mounted in a standard 19’’ (1U) rack using the
provided mounting
brackets.
a) Slide the main chassis into the desired rack location.
b) Secure the chassis using the
supplied screws.
c) Make sure the rack is grounded properly.
Summary of Contents for X2-3200G
Page 1: ...www profitap com X2 3200GPACKETBROKER PRODUCTMANUAL ...
Page 2: ...BRING CLARITY INTO YOUR NETWORKS ...
Page 35: ...31 ...