Pro-LIFT G4U-LCD Assembly Sheet
STEP 1
Install Casters
(Requires
4
bolts
per
caster)
Lock
caster
once
completed!
Repeat
above
for
4
casters
BE
SURE
TO
NOT
OVER
TIGHTEN!
STEP 2
Install Foot
(Requires
2
bolts
per
foot)
Ensure
long
extension
facing
forward
and
outward.
BE
SURE
TO
NOT
OVER
TIGHTEN!
STEP 3
Install Control Panel
(Requires
4
bolts)
Ensure
power
outlet
is
facing
outward
and
control
box
to
inside
as
per
diagram.
Once
fastened….
Connect
M1
motor
cable
to
leg
1
and
connect
M2
motor
cable
to
leg
2
BE
SURE
TO
NOT
OVER
TIGHTEN!
STEP 4
Install Accessory Shelf
(Requires
4
bolts
and
dowel
nut
‐
serts)
Ensure
“Pro
‐
LIFT”
writing
faces
back.
Slide
dowel
nut
‐
sert
into
hole
on
plastic.
Align
hole
on
dowel
nut
‐
sert
with
bolt
then
fasten
bolt
to
nut
insert.
BE
SURE
TO
NOT
OVER
TIGHTEN!
C
Left F
oot
B
Right Foot
**Indicator**
V
V
ATTENTION!!
Be sure to use M6x12mm
Socket Cap SILVER.
Failure to do so will
result in malfunction to
JORO leg!
D
D
E
E