background image

INSTALLATION GUIDE

PHONE: +44 1233 840 840 

EMAIL: [email protected]

 

ADDRESS: CATCHPOLE & RYE, SARACENS DIARY, ASHFORD, KENT, TN27 0SA

WWW.CATCHPOLEANDRYE.COM

©COPYRIGHT 2021 CATCHPOLE & RYE. 

 

ALL RIGHTS RESERVED.

The Original Arched Three Bar Heated Towel Radiator

STANDARD, DUAL FUEL & ELECTRIC MODELS

YOU WILL NEED

-  Pair of Radiator valves for Dual Fuel or Standard Models (sold separately).

-  Screwdriver

-  Pipe Cutter

-  Spanner

-  15mm Olive

-  Suitable PTFE Tape

GENERAL INFORMATION

This product is manufactured entirely in the UK and has been rigorously tested to provide many years of good service when 

installed by a suitably qualified professional.

All products must be thoroughly inspected once upon delivery and again prior to installation. Carefully remove the product packag-

ing for the initial inspection and repackage if being stored. It should be stored in a clean dry and safe environment at normal room 

temperature.

Please read these instructions carefully before commencing any work and ensure that all parts are present and in perfect condition 

before starting the installation.

If you require assistance or have any questions please call our Technical department: 01233 840 840 

or email: [email protected].

COMPONENTS

1.   Pre Assembled Towel Rail

2.   Removable Base Section 

3.   Radiator Valve Body x2

4.   1 1/2” Fixing Screws

5.   15mm Olive

6.   Telescopic Shroud

Summary of Contents for The Original Arched

Page 1: ...vice when installed by a suitably qualified professional All products must be thoroughly inspected once upon delivery and again prior to installation Carefully remove the product packag ing for the initial inspection and repackage if being stored It should be stored in a clean dry and safe environment at normal room temperature Please read these instructions carefully before commencing any work an...

Page 2: ...ed out before assembly Ensure that there are no wires or pipes behind the marked locations for the fixings Drill holes for fixings Insert plugs SECTION 1 Wall Fixings Applies to all models NEXT STEPS For electric and dual fuel models continue to SECTION 2 For Standard models skip to SECTION 3 INSTALLATION GUIDE PHONE 44 1233 840 840 EMAIL INFO CATCHPOLEANDRYE COM ADDRESS CATCHPOLE RYE SARACENS DIARY...

Page 3: ...el rail to the plugs inserted in section 1 For dual fuel models continue to section 3 For electric models test the rail IMPORTANT Electric elements should be fitted only by a suitably qualified electrician and must be earthed and connected to a cable outlet in the bathroom in accordance with I E E wiring regulations The electrical connection should be made to a 5 amp fused fixed spur located outside ...

Page 4: ...d DO NOT OVERTIGHTEN Then loosely attach the radiator valve Position the escutcheon and pipe cover over the feed pipes Attach the rail to the wall using the wall plugs installed in SECTION 1 INSTALLATION GUIDE PHONE 44 1233 840 840 EMAIL INFO CATCHPOLEANDRYE COM ADDRESS CATCHPOLE RYE SARACENS DIARY ASHFORD KENT TN27 0SA WWW CATCHPOLEANDRYE COM COPYRIGHT 2021 CATCHPOLE RYE ALL RIGHTS RESERVED The O...

Page 5: ...n These are push fit Fill the radiator and bleed using the bleed valve located under the upper left joint when looking directly at the rail Test the towel rail INSTALLATION GUIDE PHONE 44 1233 840 840 EMAIL INFO CATCHPOLEANDRYE COM ADDRESS CATCHPOLE RYE SARACENS DIARY ASHFORD KENT TN27 0SA WWW CATCHPOLEANDRYE COM COPYRIGHT 2021 CATCHPOLE RYE ALL RIGHTS RESERVED The Original Arched Three Bar Heated...

Reviews: