background image

 

 

 

1

 

 

 

 

 

 

                

Face

 

Plate

 

Prep

 

for

 

Install

 

 

 

Remove

 

acrylic

 

face

 

plate

 

from

 

Box

 

3

 

and

 

place

 

it

 

face

 

down

 

on

 

your

 

flat

 

work

 

area.

  

The

 

countersink

 

holes

 

and

 

LED

 

Light

 

channels

 

should

 

be

 

facing

 

down.

   

 

Using

 

your

 

fingernail,

 

start

 

in

 

one

 

corner

 

and

 

slowly

 

peel

 

the

 

protective

 

paper

 

back

 

until

 

it’s

 

3/4

 

of

 

the

 

way

 

removed

 

and

 

stop.

  

Now

 

lay

 

the

 

paper

 

back

 

down

 

on

 

the

 

acrylic.

 

It

 

will

 

not

 

stick

 

again,

 

but

 

will

 

protect

 

the

 

acrylic

  

from

 

getting

 

scratched

 

while

 

you

 

move

 

onto

 

the

 

next

 

step.

  

 

Set

 

this

 

piece

 

aside

 

and

 

proceed

 

to

 

Step

 

5.

 

 

 

Myriad Reservoir System

 

Congratulations

 

on

 

purchasing

 

the

 

most

 

advance

 

and

 

versatile

 

reservoir

 

system

 

ever

 

built.

  

Please

 

follow

 

the

 

install

 

guide

 

steps

 

in

 

the

 

exact

 

order

 

listed.

 

Assembly

 

Time:

 

20

 

minutes

 

Needed

 

for

 

Install:

 

‐ 

Phillips

 

and

 

Flat

 

head

 

screw

 

driver.

  

Please

 

do

 

not

 

use

 

any

 

power

 

screw

 

drivers

 

or

 

drills.

 

Flat

 

Clean

 

surface

 

24

 

inch

 

by

 

24

 

inch

 

area

 

is

 

recommended.

 

Well

 

lit

 

area,

 

and

 

a

 

comfortable

 

seat.

 

    

   

 

Imp

orta

nt

 

Info

 

Summary of Contents for Myriad

Page 1: ...stick again but will protect the acrylic from getting scratched while you move onto the next step Set this piece aside and proceed to Step 5 Myriad Reservoir System Congratulations on purchasing the m...

Page 2: ...rame down on your flat surface and start the O ring in one corner of the frame Begin feeding it and pressing it into the groove of the frame Take your time if you go too fast the O Ring WILL pop out A...

Page 3: ...and leak Once the central frame is properly fitted to the pump housing remove the rest of the protective paper off the acrylic face plate and lay gently on the frame Make sure the O ring is still in t...

Page 4: ...perly Insert the screws into the holes and begin to tighten Follow the same tightening process as you did previously Tightening these screws to hand tight tension just like the center screws is adequa...

Page 5: ...rneath it and tighten screws into plate Tighten the screws all the way down and then untighten approximately turn or until the plate slides back and forth Repeat for other bracket There are 8 screws p...

Page 6: ...installed cap will be perfectly horizontal with the pump and housing If the cap is crooked it will leak Unscrew the cap and repeat until the cap is installed properly Fill and Test As with any water c...

Page 7: ...VD drive that is twice as tall Insert the reservoir so its flush with the case and tighten the screws on the bracket plates You may need to remove the reservoir and repeat this process a couple times...

Reviews: