
18
If you find a gas leak, shut off the gas supply at the gas container valve
and contact your dealer or manufactures’ sevice center.
6. Install the gas cylinder to the dedicated place inside the appliance
and secure with the clamp.
7. Carry the heater to the supposed place of operation observing the
rules and precautions described in this Instruction manual.
8. The appliance is ready for work.
4. Proper use
Open the carton and take out the gas heater. Make sure the gas type
you will use are exactly the same as the one specified on the heater.
Operate the heater according to following procedures when gas
power is used.
1) Operation
a) This appliance is designed to be used with a 5.5~15 kg LPG gas
cylinder. The maximum cylinder size should be: Dia. 320mm, height:
650mm Take out of the rear panel and move a full gas cylinder into the
heater. To prevent gas cylinder falling down at the counter side, fasten
the rear panel reversely on the side panels.
b) Joint the gas inlet of the heater with regular hose and hold tightly
with clip. The other side of hose is connected to gas outlet of regulator
and held tightly with clip. Turn the gas switch on, check gas tightness at
the jointed parts by soapy water until gas leakage does not exist.
c) Turn on the gas outlet regulator.
Summary of Contents for NY-158A
Page 2: ...1 1 1 2 1 2 3 4 5 6 7 8 50 9 10 11...
Page 3: ...2 3 1 2 3 4 5 service 6 7 8...
Page 4: ...3 4 1 5 5 15 kg 320mm 650 mm 30...
Page 5: ...4 15 2 3 1 4 1 30 38cm 2 56 70cm 3 84 106 cm...
Page 6: ...5 i 4 2kW 306g h EN 40 EN12864 EN16129 max 1 5kg h...
Page 7: ...6 5...
Page 8: ...7 1 low medium high 1 LOW 10 10 15 LOW 2 medium 3 high...
Page 9: ...8 5 100 jet...
Page 10: ...9...
Page 11: ...10...
Page 12: ...11 6 2...
Page 13: ...12 1 2 3 1 2 3 4 5mm 1 2 1 10 2 1 1...
Page 14: ...13 1 2 1 2 1 2 3 4...