17
9. Gas pressure regulator
10. Gas cylinder clamp
11. Gas cylinder
3. Preparation
1. Carefully remove the heater from the package.
2. Make sure that the heating elements and other parts of the
appliance have no remaining crumbles of packing foam plastic or other
debris.
3. Carefully install the enclosed gas hose not twisting or breaking it. For
that ,push on one end of the hose onto the gas valve connector
(Nozzle), while the other end onto the connector of the enclosed gas
pressure regulator. Secure gas hose ends on the connectors with
jubilee clips.
4. Install a paronite/rubber spacer inside the cap nut checking its
integrity beforehade and then carefully screw the nut on the outlet of
an already prepared gas cylinder having appropriate capacity(a gas
cylinder is not included in the delivery set and purchased separately).
Twisting of the hose is strongly not allowed.
5. Slowly turning the gas pressure controller (cylinder check valve),
make sure that no gas leaks are present. For that:
-Lubricate all joints with soapy water. Gas leaks cause formation of
bubbles in permeable places.
-NEVER USE MATCHES OR LIGHTER FOR GAS LEAK CHECKS.
Summary of Contents for NY-158A
Page 2: ...1 1 1 2 1 2 3 4 5 6 7 8 50 9 10 11...
Page 3: ...2 3 1 2 3 4 5 service 6 7 8...
Page 4: ...3 4 1 5 5 15 kg 320mm 650 mm 30...
Page 5: ...4 15 2 3 1 4 1 30 38cm 2 56 70cm 3 84 106 cm...
Page 6: ...5 i 4 2kW 306g h EN 40 EN12864 EN16129 max 1 5kg h...
Page 7: ...6 5...
Page 8: ...7 1 low medium high 1 LOW 10 10 15 LOW 2 medium 3 high...
Page 9: ...8 5 100 jet...
Page 10: ...9...
Page 11: ...10...
Page 12: ...11 6 2...
Page 13: ...12 1 2 3 1 2 3 4 5mm 1 2 1 10 2 1 1...
Page 14: ...13 1 2 1 2 1 2 3 4...