background image

Flush Channel Installation Guide

3

v001  |  Flush Channel Installation Guide

Read and save these instructions before beginning to install the Node Flush Channel. 

Warning!

 

To reduce the risk of fire, electric shock, or injury to persons, observe the following:

•  When cutting or drilling into wall or ceiling do not damage electrical wiring and other hidden utilities

•  Use this unit only in the manner intended by the manufacturer. If you have any questions, contact the 

manufacturer 

[email protected]

.

Before You Start

Inspect all product parts for flaws and shipping damage.  

If anything is discovered to be damaged, contact the shipping company and manufacturer immediately.  

Warning! Damaged or missing parts must be reported to PARC at [email protected]

[email protected] immediately, PARC will 

not be responsible for any damage or loss that occurs during unpacking or installation.

Site Conditions, Storage and Handling 

Read this guide before handling the product.

•  Read the Installation Guide before handling.

•  Always wear appropriate hand protection when handling.

•  Only store in clean dry conditions.

•  Do not over stack.

•  Do not stack in a way likely to cause falls.

Poor or rough handling, rolling or dropping of the product on corners or edges may cause damage to the product or 
cause the product to deteriorate.  

Lengths of Node should not span between points as any load applied mid-span may cause product damage. 

Site storage of items should be flat, preferably on a suitable pallet (supporting the entire length of the Node Flush 
Channel) without additional top loading. 

Consideration should be given to the advice of the Site Occupational Health and Safety Representative regarding 
manual handling. An assessment should be made of any risk and if necessary mechanical lifting equipment should be 
used.

The storage space must be cleared of debris and, in general, should be enclosed. The Node Flush Channel should be kept 
clean, dry and protected from the elements. 

Site conditions should be prepared for installation of the Node Flush Channel. The site should be clean, dry and clear of 
other trades working in the ceiling void.  

                

Flush Channel with Diffuser  

                                            Installation Guide 

Flush Channel with Diffuser Installation Guide 

 

Read and Save these Instructions before beginning to install Node Flush Channel with Diffuser: 

Warning! 

To reduce the risk of fire, electric shock, or injury to persons, observe the following: 

When cutting or drilling into wall or ceiling do not damage electrical wiring and other hidden utilities. 

Use this unit only in the manner intended by the manufacturer. If you have any questions, contact the 

manufacturer [email protected]

 
Before You Start: 

Inspect all product parts for flaws and shipping damage.  

If anything is discovered to be damaged, contact the shipping company and manufacturer immediately. 

 

Node Flush Channel with Diffuser Installation Tools Required: 

 

 

 

Site Conditions, Storage & Handling:  

Read This Guide before handling the product. 

Read the Installation guide before handling. 

Always wear appropriate hand protection when handling. 

Only store in clean dry conditions 

Do not over stack. 

Do not stack in a way likely to cause falls. 

Poor or rough handling, rolling or dropping of the product on corners or edges may cause damage to the product or 

cause the product to deteriorate.  

 

Lengths of node should not span between points as any load applied mid-span may cause product damage. 

Site storage of items should be flat, preferably on a suitable pallet (supporting the entire length of the Node Flush 

Channel with Diffuser) without additional top loading. 

 

Consideration should be given to the advice of the Site Occupational Health & Safety Representative regarding manual 

handling. An assessment should be made of any risk and if necessary mechanical lifting equipment should be used  

 

Tools Required 

LEVEL

4 MM HEX KEY 

DRIVER

T25 TORX DRIVER

5/16”     /     8MM 

SOCKET OR 

WRENCH

LASER LEVEL

MEASURING TAPE

NODE REMOVAL 

TOOL

Summary of Contents for PARC Node

Page 1: ...Flush Channel Installation Guide...

Page 2: ...t Overview 2 Read and Save These Instructions 3 Before You Start 3 Tools Required 3 Site Conditions Storage and Handling Instructions 3 Flush Channel Installation Sequence 4 Access Cables 4 Connecting...

Page 3: ...rdinated with the manufacturer to the required sizes to match the building design The Node Flush Channel can be site cut if required The Node devices are supplied separately from the channel assemblie...

Page 4: ...be enclosed The Node Flush Channel should be kept clean dry and protected from the elements Site conditions should be prepared for installation of the Node Flush Channel The site should be clean dry...

Page 5: ...hole provided Before connecting the channel face to the mounting assembly connect the other end of the Node access cable to the flange on the inside of the channel face in the hole provided When lowe...

Page 6: ...ure a high quality joint between adjacent channel faces Figure 4 Figure 6 Figure 5 Connect all required sections ensuring no visible gap between both sections Finished installation should be as shown...

Page 7: ...ength this should be done at the end rather than a joint to minimize visual impact The maximum length that can be trimmed is defined by the position of the bridge bracket Node Device Installation Node...

Page 8: ...e Node removal tool anti clockwise until the Node device is released Figure 9 Waste Disposal Management PARC Node Channels are shipped and packaged with protective material that should be disposed of...

Reviews: