Step 6 (If Applicable):
If installing the
filler section next to a connecting unit
and wall, follow Step 5 for installing to
connecting unit. Repeat once. When
installing to the wall, locate the side
mounting brackets as shown in Figure
20 and secure in place with screws, by
installing mounting brackets to wall at
approximate heights shown in Figure 20.
Step 7:
Slide the filler section tabs
into the side mounting brackets and at
the same time insert the top flange of
the filler section into the top mounting
bracket as pictured in Figure 21. Push
down to secure in place.
Step 8:
Use the self-tapping screws in
pilot holes across the length of the filler
section bottom to secure to the bottom
mounting bracket. Pictured in Figure 21.
FIGURE 20
FIGURE 21
WALL MOUNTED
BRACKETS
11.625
12.875
23.750
9.800
FLOOR MOUNTED
BRACKETS
PUSH DOWN
APPROX. 1.125" GAP IN BETWEEN
TOP MOUNTING BRACKET AND
WOOD BLOCKING
FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
27
www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual