XL2 SLIDE-OUT SERVICE MANUAL
6. Use C-clamp to peel the panel from the
slide-out structure.
7. Check where adhesive, sealant and double
face adhesive tape are on the structure and
the panel back side, in order to be able to
stick the new panel in the same way.
8. Check the tape width and use same width
tape when installing new panels.
Caution: Make sure the heat gun nozzle tip is at
least 4" from surface.
9. Use a heat gun and putty knife to remove
the dried off adhesive and tape residue from
the structure.
Warning: Because of the adhesive toxicity,
never use a buffer or other sanding method to
remove it.
14.4 CORNER PANELS
INSTALLATION
Note: The corner panels are made of aluminum,
or of stainless steel in option. Use rivet of same
material as the panels.
For surface cleaning and preparation, panel
installation, and products needed, refer to the
MTH side panel installation procedure described
in Prevost service manual, and:
-
Protect adjacent surfaces with appropriate
material;
-
Make sure to apply sealant between the pin
receptacles and the corner panels (figure 15
and figure 16);
-
Make sure to apply adhesive around the pin
receptacle
-
Cut in the panel before installing the panel
on the slide-out (figure 15 and figure 16);
-
Refer to figure 44 and figure 45 for
adhesive, tape and rivet position.
14.5 TOP AND BOTTOM PANELS
REMOVAL
Note: The top and bottom panels are made of
aluminum sheets.
1. Remove the slide-out as described in
2. Remove panel rivets with a 1/8" drill bit, a
hammer and a punch (figure 46).
3. Insert a flat screwdriver between the panel
and the slide-out structure, and unstick the
panel from the structure.
4. Use C-clamp to peel the panel from the
slide-out structure.
5. Check where adhesive, sealant and double
face adhesive tape are on the structure and
the panel back side, in order to be able to
stick the new panel in the same way.
6. Check the tape width and use same width
tape when installing new panels.
7. Use a heat gun and putty knife to remove
the dried off adhesive and tape residue from
the structure.
Warning: Because of the adhesive toxicity,
never use a buffer or other sanding method to
remove it.
14.6 TOP AND BOTTOM PANELS
INSTALLATION
Note: The top and bottom panels are made of
aluminum sheets and need aluminum rivet.
For surface cleaning and preparation, panel
installation, and products needed, refer to the
MTH side panel installation procedure described
in Prevost service manual, and:
-
Protect adjacent surfaces with appropriate
material.
-
See figure 46 and figure 47 for both bottom
and top panel adhesive, sealant and tape
position.
R3
33
May 3, 2002
Summary of Contents for Le Mirage XL II Ultimate
Page 6: ...XL2 SLIDE OUT SERVICE MANUAL FIGURE 1 SLIDE OUT MECHANICAL COMPONENTS R3 6 May 3 2002...
Page 51: ......
Page 52: ......
Page 53: ......