
Twin Platform
Storage Bed
Required Tools
Screwdrivers
Flat Head
Using a power screwdriver
will speed up assembly.
Caution
Do not over tighten any screw.
The last few turns of each screw
should be done very slowly or by hand.
Phillips Head
Optional Tools
D
A
T
E
S
T
A
M
P
Prepac Manufacturing Ltd.
6705 Dennett Place
Delta, BC V4G 1N4
LB-0623-R
2007-03-08
Model # BT-4100-2K
Assembly Instructions
For the following collections:
Broadway, Chelsea, Everett, Manhattan,
Monterey, Montego,Sonoma
CALL US FIRST
1-877-PREPAC1
1-877-773-7221
Mon - Fri
7am - 4pm PST
10am - 7pm EST
•
For help with assembly
•
If you have received a damaged or
defective part or are missing hardware.
We will process replacement parts
UPS Ground or mail.
Before you call please:
2) Note
the
3) Review the contents of your shipment to
determine what you are missing. This unit
is shipped in 2 cartons. Make sure you
have received both cartons.
in 2
business days or less. Parts are shipped via
1)
Record the following information from the
shipping label on the outside of the box.
You will need it for warranty purposes:
•
Ship To Name
•
Sales Order Number
product model number.
Hammer
Online Option:
Fill out the Parts Order Form on our website.
Go to
www.prepacmfg.com
and choose
Parts Order
from the
Support
menu
This product is shipped in
2 cartons
Make sure you have both cartons.
Sometimes cartons shipped on the same
day get separated and are delivered on
different days.
1 of 2
+
2 of 2