
Page 14 of 20
Attach second outer gable to stabilizers with JCB connectors
STEP 12
Estimated Time: 10 minutes
Secure the gable in place with connectors, but don’t
fully tighten
12a
12b
Ensure the slats are set inside the U-channel and that
they haven’t pulled out of the first outer gable.
12c
Firmly tighten the connectors