Prepac BT-4100-2K Assembly Instructions Manual Download Page 19

Page 17 of 20

1½” Hi Lo Screws 

13c

Attach drawer sides to drawer back with 1½” Hi Lo screws

13d

Attach drawer front and tighten cams 
using a flat head screwdriver

Right Drawer Side

Locked

Turn 210°

Unlocked

Left Drawer Side

Unlocked

Locked

Turn 210°

Summary of Contents for BT-4100-2K

Page 1: ... ce que l overture soit face au trou de la vis d assemblage Drawer Assembly Instructions Supplement to Product Assembly Mode d assemblage de tiroir Supplément à l Assemblée de produit 12mm Zinc Cam 4 Ferrure en zinc 12mm RM 0502 Drawer Slide Screw 4 Vis pour glissement de tiroir RM 0074 8 1 Screws 4 Vis no 8 1 RM 0504 Left Right Glide for Drawer Side Glissement de tiroir gauche et droit pour le cô...

Page 2: ...30pm Pacific Time 10 00am 7 30pm Eastern Please have your product series number ready Si des pièces sont manquantes veuillez envoyer un email à parts prepacmfg com visitez www prepacmfg com ou téléphoner au 1 877 PREPAC1 1 877 773 7221 lors des heures suivantes LUN VEN 7h 00 à 16h 30 heure du Pacifique Veuillez noter le numéro de série avant de téléphoner Pour le service en français contactez s il...

Page 3: ...efective part or are missing hardware We will process replacement parts UPS Ground or mail Before you call please 2 Note the 3 Review the contents of your shipment to determine what you are missing This unit is shipped in 2 cartons Make sure you have received both cartons in 2 business days or less Parts are shipped via 1 Record the following information from the shipping label on the outside of t...

Page 4: ...ster Dowel 12 RM 0501 Nail 15 RM 0022 12mm Zinc Cam 12 RM 0502 8 1 Hi Lo Screws 12 RM 0504 4 per drawer T Spacer 12 RM 0628 Drawer Slide Screw 50 RM 0074 Bed Hardware Drawer Hardware Page 2 of 20 JRN Nut 24 RM 0312 JCB Connector 24 RM 0310 bronze cherry espresso RM 0311 chrome white maple RM 0314 black 8 per drawer Drawer Slides for Bed Allen Key 1 RM 0313 5 per drawer ...

Page 5: ...2 black GA 4912 cherry GA 4712 maple GA 4012 white Upper Stabilizer ST 4722 maple 1 ST 4122 black ST 4922 cherry ST 4022 white Lower Stabilizer ST 4723 maple 1 ST 4123 black ST 4923 cherry ST 4023 white Wooden Slats 1 BF 1000 Metal U channel 2 BF 1000 U B1 B1 B2 B2 B4 B3 B5 B7 B7 Side Panel SG 4702 maple 1 SG 4102 black SG 4902 cherry SG 4002 white ...

Page 6: ...drawer slide screws as shown STEP 2 Estimated Time 10 minutes Drawer Slide Screw B1 STEP 1 Estimated Time 10 minutes Page 4 of 20 B1 These instructions show the Twin Bed assembled with the drawers facing to the right Both outer gables are identical After the bed is assembled it can be positioned to face right or left IMPORTANT ...

Page 7: ... on outer gables as shown in the photo Position the Drawer Glides with A The wheel at the finished side B The wheel on the unfinished bottom Finished Side Bottom STEP 3 Estimated Time 10 minutes Use 1st hole Use 14th hole Use 1st hole Use 14th hole ...

Page 8: ... 5 minutes Insert JRN nuts into the holes on each end of the inner gables The holes are drilled through You can insert them from either side B2 Insert the nut as shown so that the hole lines up with the hole on the edge of the gable B2 ...

Page 9: ...Page 7 of 20 B3 STEP 5 Estimated Time 5 minutes Insert JRN nuts into the holes on each end of The side B3 The upper stabilizer B5 The lower B4 stabilizer B5 B4 ...

Page 10: ...m each edge of the T Spacer to each unfinished edge B The measurement that is approximately 4 will be the BOTTOM 6c Repeat steps 6a 6b for the 2nd side of the inner gables INCORRECT CORRECT Wheel is on the bottom and toward finished edge Finished Edge Bottom Top 4 Unfinished Edge 4 Attach T spacers and drawer glides to Inner Gables 6a Drawer Slide Screw Attach drawer glides to T spacers on inner g...

Page 11: ...and the Allen Key provided attach the side panel B3 to both inner gables The finished edge should be facing up If you have any difficulty tightening the JCB connector use a screwdriver to adjust the JRN nut to make sure the hole is facing the opening for the connector JCB Connector JRN Nut B3 ...

Page 12: ...utes Using JCB connectors and the Allen Key provided attach the lower stabilizer B4 to both inner gables BELOW the drawer slide Identifying the Lower Stabilizer The screw hole is at the top close to the finished edge IMPORTANT Finished edge B4 ...

Page 13: ...11 of 20 STEP 9 Estimated Time 5 minutes Upper Stabilizer The screw hole is closest to the lower unfinished edge Unfinished Edge Using JCB connectors attach the upper stabilizer B5 to both inner gables B3 B5 ...

Page 14: ...Page 12 of 20 STEP 10 Estimated Time 10 minutes Attach one outer gable to stabilizers with JCB connectors Outer Gable B1 ...

Page 15: ...lon strip should be on the bottom Slide STEP 11 Estimated Time 5 minutes 11a 11b Slide the slats into the metal U channel B7 on the outer gable On each end of the u channel there is a metal divider One slat on each side should be positioned between this divider and the end of the U channel 11b ...

Page 16: ... JCB connectors STEP 12 Estimated Time 10 minutes Secure the gable in place with connectors but don t fully tighten 12a 12b Ensure the slats are set inside the U channel and that they haven t pulled out of the first outer gable 12c Firmly tighten the connectors ...

Page 17: ...awer Front 3 DF 4702 maple DF 4102 black DF 4902 cherry DF 4002 white Left Drawer Side 3 DS 0415 L Plywood Drawer Back 3 DK 4101 unfinished Right Drawer Side 3 DS 0415 R Plywood Drawer Bottom 3 DB 4101 unfinished D5 D1 D4 D3 D5 Page 15 of 20 D1 ...

Page 18: ... STEP 13 Estimated Time 5 minutes PER DRAWER Insert cams into drawer sides Screw green twister dowels into drawer fronts 13a 13b D3 D2 D1 Left Drawer Side Right Drawer Side Make sure arrow faces toward hole for twister dowel Page 16 of 20 ...

Page 19: ... Cabinet a t Identi ic ti n 13c Attach drawer sides to drawer back with 1 Hi Lo screws 13d Attach drawer front and tighten cams using a flat head screwdriver Right Drawer Side Locked Turn 210 Unlocked Left Drawer Side Unlocked Locked Turn 210 ...

Page 20: ...Page 18 of 20 13e Turn drawer upside down and slide drawer bottom into grooves 13f Secure the drawer bottom to the drawer back with nails Use 5 nails per drawer C ...

Page 21: ...13g Attach drawer slides to left and right drawer sides using drawer slide screws Right Drawer Side Left Drawer Side Page 19 of 20 Drawer Slide Screws Drawer Slide Screws ...

Page 22: ... Our products are made from durable composite woods with a laminate finish and therefore should not be painted or varnished Q Are they waterproof A NO If liquid is spilled and quickly wiped up no damage will be done to your product However continuous exposure to liquids or high humidity may cause damage to the board Give Us Your Feedback Furniture Care Q A Page 20 of 20 Thanks STEP 14 Estimated Ti...

Reviews: