
9532-002-001-11
PSD-TTS-B
Installation Guide
8
Step 2
Insert the tubes into the secured aluminum block. See diagram to set the cable access openings before tightening the set screws.
See figure A. Once the poles are fully inserted into the block and set to their proper positions lock the tubes by tightening the two
(2) M8 socket head screws.
Do not over tighten the set screws.
Install the plastic caps to the top of the tubes. See figure 2.
Plastic caps
Allen wrench
(2) M8 x 10 socket
head screws
Base
Tubes
2 O’clock
10 O’clock
Tube location for cable
access