![Premier Mounts PP-FCTA Installation Instructions Manual Download Page 5](http://html1.mh-extra.com/html/premier-mounts/pp-fcta/pp-fcta_installation-instructions-manual_1596215005.webp)
Installation Instructions
Visit the Premier Mounts website at http://www.mounts.com
Page 5
PP-FCTA
Read these instructions before installing your Premier Mounts product.
Make sure you have all the parts and tools you need to safely complete the installation.
Some of the steps in this installation may require two people to prevent personal injury and/or damage to the projector.
Read all the warnings in the manual and always use proper safety equipment.
PP-FCTA Installation
Introduction
Ceiling Plate Assembly
Place the lower adapter plate with the threaded studs
facing up through the adjustable slide slots of the
main ceiling plate.
The threaded studs will align with the adjustable
slide on the main ceiling plate.
®
Once the two pieces are together, align the mounting
holes on the upper adapter plate with the threaded
studs of the lower adapter plate.
¯
Place the three units together and loosely attach four
(4) ¼”-20 wing nuts onto the threaded studs (see
inset below).
Threaded Studs
Lower Adapter Plate
Adjustable Slide Slots
Main Ceiling Plate
¼”-20 Wing nuts
Upper Adapter Plate
Are you adding a camera to the ceiling adapter?
If
Yes,
proceed to the
“Camera Screw Installation
(optional)”
section on page 6.
If
No,
proceed to the
“Mounting the PP-FCTA”
section on page 7.