© Precor Incorporated, Unauthorized Reproduction and Distribution Prohibited by Law
Page 8
In This Section
Primary Belt Tension Adjustment .............................................................................. 9
Adjusting the Seat Carriage - RBK Only ................................................................... 10
This section provides you with a quick method of checking operation.
Procedure
1
Start pedaling.
2
With the banner displayed, press QUICK START.
3
The resistance will start at Level 1.
4
Operate the RBK13/UBK13 for 4–5 minutes. As you operate the bike, concentrate on the operating
sounds made by the unit. Be on the alert for unusual rubbing, hitting, grinding, or squeaking noises.
5
Press the RESISTANCE
key until you reach Resistance Level 10. Operate the RBK13/UBK13 for
another 2–3 minutes.
6
If the electronic display does not change appropriately, reference per the, Standard Console service
manual.
7
If the resistance does not change or the operation of the bike feels inconsistent compared with
Resistance Level 1, troubleshoot per procedure, No or Incorrect Pedaling Resistance .
8
Press the RESISTANCE
key until you reach Resistance Level 20. Operate the bike for another 2–3
minutes.
9
If the resistance of the bike does not change or operation feels inconsistent with Resistance Levels 1
and 20, troubleshoot per procedure, No or Incorrect Pedaling Resistance.
10
Check the LED’s mounted on the upper PCA and the function keys displayed on the electronic
console by performing the diagnostics test in the Standard Console service manual.
S e c t i o n F o u r
Checking the Bicycle
Operations
Summary of Contents for UBK13
Page 2: ......