AB-103 Assembly Guide
page 7
1
Preparations
Preparations
The AB-103 parts are inspected before shipment.
Each unit contains several pieces that require
assembly. You will need to ask another adult for
assistance during the assembly process.
Unpacking the Equipment
When you open a box, carefully unpack the pieces
and lay them on the floor near the location where you
plan to use them.
CAUTION: Be careful when you remove the
packaging material with a utility knife. Do not cut
the upholstery or scratch the paint.
If any items are missing, contact the dealer from whom
you purchased the unit. For more information, refer to
Obtaining Service
.
Required Tools
Tools that you need to obtain before assembling the
unit include:
❏
¾-inch open-end wrench
❏
Wire tie cutter or utility knife
Installation Requirements
Follow these installation requirements when
assembling the unit:
•
Review the
Important Safety Guidelines for
Owners
.
•
Assemble the unit where it will be used
.
•
Install components in the sequence shown.
•
Insert all fasteners in the same direction
. For
aesthetic purposes, insert all the fasteners in
the same direction unless specified (in text or
illustrations) to do otherwise.
•
Leave room for adjustments.
Tighten the
fasteners to keep the unit stable, but leave room
for adjustments.
Summary of Contents for AB-103
Page 1: ...Assembly Guide AB 103 ...
Page 2: ......
Page 6: ...AB 103 Assembly Guide page 6 ...
Page 15: ...AB 103 Assembly Guide page 15 Notes ...
Page 17: ...General Safety Maintenance Manual Precor Icarian Line Commercial Strength Equipment ...
Page 18: ......
Page 46: ...General Safety and Maintenance Manual Recommended Maintenance Checklist 28 Notes ...
Page 47: ......