background image

© 2018 Precision Lighting Ltd.    We reserve the right to change details of design, materials and finish.    Version   07.19

1. Installation

WARNING 

switch off power to mains 

before installation.

 

 

Cut hole ø18mm (3/4 of an inch).  
Feed mains cable through hole and insert 

Minipoint into hole.

Note: 

You will need 

rear access

 to 

minipoint in order to secure it into place. 

Put on lock washer and then screw on 

M17 nut onto back of minipoint. Fasten 

tightly to secure minipoint in place. 

Screw on decorative cover with desired 

finish on to top of minipoint. 

1.

2. Inserting Atto Jack into Minipoint

WARNING 

switch off power to mains 

before installation.

 

WARNING 

Do not hot plug! 

Insert Atto jack luminaire into the 

minipoint ensuring to line up pins with the 

internal grooves.

Keep applying pressure until you hear 

a soft click and the O ring is no longer 

visible.

3. Locking Pan & Tilt

NOTE 

Only adjust luminaire position 

when unlocked.

 

Adjust luminaire to desired position. To 

lock into place, insert 0.9mm hex key 

provided into pan and tilt holes then 

rotate hex key clockwise.

2.

ø18

M17 Fixing

M17 Fixing

CLICK!

CLICK!

WARNING

Do not hot plug!

3.

PAN

TILT

Reviews: