![prana 150 ERP LITE Technical-Operating Documentation Download Page 10](http://html.mh-extra.com/html/prana/150-erp-lite/150-erp-lite_technical-operating-documentation_1593560010.webp)
10
ASSEMBLY IN THE REVERSE ORDER
The technological process provides for 100% inbound quality control for all components,
as well as double 100% inbound control after their manufacture and 24-hour run in the
maximum power mode.
Transportation and storage of the products in individual packing boxes is ensured in a
horizontal position.
Keep the recuperator in the factory packaging under the cover or (in enclosed space) with
relative humidity of air of no more than 70% and air temperature from -20˚С to + 40˚С.
TRANSPORTATION AND STORAGE RULES
12. The drain in the
heat exchanger and
the body
must coincide and
be below during the
installation.
13. The heating of the condensate drainage
(the heating element) must be located
beneath near the hole in the housing.
14. The fl ange must be installed
correctly; the larger protrusion of
the should be below.
>
11. Clean the heat exchanger in adry or, if
necessary, in a wet manner.
WARNING!
Before rinsing or wet cleaning of the
heat exchanger, make sure that all
the electrical components and parts
are removed from the heat exchanger
(except for the components of
“Mini heating up” and “heating the
condensate drainage”.
QUALITY
Summary of Contents for 150 ERP LITE
Page 12: ...12 ...