background image

20

 User Manual

Zenex Pro

Parameter Description

Settings 

Default Value

POWER-FAIL RECOVERY METHOD

Abort  

The timer operation is suspended until a new start command is 
issued. 

Start

The timer re-runs the complete soak time.

Continue   

The Soak Timer resumes operation for the balance time. 

(Default : 

Continue)

Continue

(Re)Start

Abort

SOAK TIMER OPERATION

Figure 8.1

SP

PV

Time

PV

Set Time

 Timer count down starts

PV enters start band,

Start Band

Basic Operation

The Soak Timer is essentially a 

preset timer

  that can be configured to run as :

(a)   A Free Running Timer by setting timer ‘Start Band’  to 0. That is, the timer starts counting down immediately upon issuance 

of Start Command by the user and continues until set time is elapsed.

(b)   A Setpoint Dependent Timer. That is, after issuance of Start Command, the count down starts only after the PV reaches  

within timer ‘Start Band’. The timer start band is a symmetrical band centered around the SP. For example, for a start band 

of 2°C and SP value of 100°C, the count down begins once the PV reaches a value within 98°C (SP - Start Band) to102°C 

(SP + Start Band). Note that, once the PV enters ‘Start Band’, the timer continues to run regardless of whether the PV 

remains within or outside the ‘Start Band’.

Hold Band Operation

The timer is also provided with a ‘Hold Band’ that can be enabled to make sure that the timer counts down

 only while 

the PV is 

within the ‘Hold Band’. That is, the timer pauses (holds counting down) whenever the PV is outside the ‘Hold Band’. The ‘Hold 

Band’ is set with respect to the SP and can be set above or below or above and below the SP. For example, a 5 °C Hold Band 

below the SP (say,100°C) will force the timer in pause state whenever the PV is equal or less than 95

°

C (SP - Hold Band). 

Summary of Contents for Zenex Pro

Page 1: ...User Manual Zenex Pro Zenex Pro User Manual Advanced Universal Self Tune PID Temperature Controller with Programmable Timer...

Page 2: ...S OPERATION 8 4 PAGE 10 I O CONFIGURATION PARAMETERS 10 5 PAGE 12 OP2 FUNCTION PARAMETERS 12 6 PAGE 13 OP3 FUNCTION PARAMETERS 15 7 PAGE 14 PID CONTROLPARAMETERS 17 8 PAGE 15 SOAK TIMER PARAMETERS 19...

Page 3: ...Flashes Alarm 1 status if OP2 function is Alarm OP2 OP3 Indicates Output 3 status if OP3 function is Auxiliary Control Flashes Alarm 2 status if OP3 function is Alarm COM Serial Communication Status...

Page 4: ...hows the Balance SoakTime WLO Water Level Status Flashes if water level is LOW Unused L1 Symbol Key Function Press to enter or exit set up mode DOWN UP ENTER Press to store the set parameter value and...

Page 5: ...owing SP value If permitted at Supervisory Level step through the following sequence for adjusting the SP value 1 While the Lower Readout shows SPvalue press and release UPor DOWN key once The Lower R...

Page 6: ...lability of operator parameters is controlled at supervisory level and these parameters are not affected by the master lock status Accessing Operator Page Adjusting Parameters Step through the followi...

Page 7: ...D Positive or Negative Alarm 1deviation band 1999 to 9999 or 199 9 to 999 9 ALARM 1 WINDOW BAND SymmetricalAlarm 1 window band 3 to 999 or 0 3 to 99 9 No Yes Table 2 2 PAGE 0 OPERATOR PAGE The Operato...

Page 8: ...Alarm 2 deviation band ALARM 2 DEVIATION BAND 199 to 999 or 199 9 to 999 9 SymmetricalAlarm 2 window band ALARM 2 WINDOW BAND 3 to 999 or 0 3 to 999 9 OP3 Function Auxiliary Control Parameter Descrip...

Page 9: ...7 User Manual Zenex Pro Control Setpoint SP Locking Parameter Description Settings SETPOINT LOCKING Set toYes to lock the SPediting on the Lower Readout No Yes...

Page 10: ...st rolls back to the first parameter 5 Use UP DOWN keys to adjust the parameter value The display flashes if UP key is pressed after reaching the maximum value or DOWN key is pressed after reaching th...

Page 11: ...g disabling the Lock step through the following sequence Locking 1 Press and release PAGE key while the controller is in the MAIN Display Mode The Lower Readout shows PAGE and the Upper Readout shows...

Page 12: ...Off The control algorithm tends to maintain the PV at SP by either switching the output say Heater fully OFF or fully ON The On and Off switching is differentiated by the user settable Hysteresis Ban...

Page 13: ...Applicable for OP1 as DC Linear Voltage Applicable for OP1 as DC Linear Current Relay SSR Solid State Relay Min Range to Setpoint High for the selected Input Type Option What it means Range Min to Ma...

Page 14: ...e or negative Deviation Band value Window Band The alarm activates if the PV deviation from SP is greater than the set Window Band value in either direction End Of Soak The OP2 Relay SSR is switched O...

Page 15: ...lable for End of SoakAlarm Sets time duration in seconds for which the alarm shall activate upon end of soak timer 5 to 250 Seconds Default 10 OP2 Function Auxiliary Control Parameter Description Sett...

Page 16: ...Control Setpoint SP Offset Value 0 to 250 or 0 0 to 25 0 Default 0 HYSTERESIS Differential dead band between the blower ON and OFF states 1 to 250 or 0 1 to 250 0 Default 2 or 0 2 TIME DELAY This para...

Page 17: ...eviation Band value Window Band The alarm activates if the PV deviation from SP is greater than the set Window Band value in either direction End Of Soak The OP2 Relay SSR is switched ON for the time...

Page 18: ...F otherwise Reverse The Output remains ON for PV above Setpoint and OFF otherwise Parameter Description Settings Default Value LOGIC Normal TheAlarm output Relay SSR remains ON under alarm condition O...

Page 19: ...PID Control The Proportional band is defined in terms of process value deviation from the setpoint also known as process error Within the band the output power is varied from maximum 100 at maximum de...

Page 20: ...ns like variations in load power supply fluctuations etc fast enough so as retain the process value near the setpoint The derivative time determines how strong the output power will change in response...

Page 21: ...AND After issuance of start command the timer starts counting down once the PV enters the process band around SP defined by this parameter value 0 to 9999 or 0 0 to 999 9 Default 5 or 0 5 HOLDBACK STR...

Page 22: ...er issuance of Start Command the count down starts only after the PV reaches within timer Start Band The timer start band is a symmetrical band centered around the SP For example for a start band of 2...

Page 23: ...timer stops execution until a start command is issued End of Soak Events The output Relay SSR modules OP2 and or OP3 can be configured as End of Soak Alarm with a settable alarm duration That is upon...

Page 24: ...he PV takes longer to reach the SP Decreases the value if the overshoot persists 1 0 to 2 0 1 2 Default SELF TUNE ON SETPOINT CHANGE Enable Re tune the controller if there is a substantial large chang...

Page 25: ...ssuing Soak Timer Start Command An open to close contact will initiate the SoakTimer Water Level Low Digital Input is used for detecting Low Water Level SLAVE ID This parameter assigns a unique identi...

Page 26: ...ead Write parameters can be accessed for both reading and writing No The Read Write parameters can only be accessed for reading That is the parameter values cannot be altered through serial communicat...

Page 27: ...iew OP1 OP2 OP3 SOK WLO Zenex Pro TMR COM L1 V H Parameter Dimensions mm inches H V 45 0 0 5 45 0 0 5 1 77 0 0 02 1 77 0 0 02 OUTER DIMENSIONS AND PANEL CUTOUT The Figure 10 1 shows the controller out...

Page 28: ...the controller housing through the panel cutout from the front of the mounting panel 3 Hold the controller gently against the mounting panel such that it positions squarely against the panel wall see...

Page 29: ...ply is switched off while making removing any connections or removing the controller from its enclosure CONNECTION DIAGRAM The Electrical Connection Diagram is shown on the top side of the enclosure T...

Page 30: ...ble Thermocouple Connect Thermocouple Positive to terminal 17 and Negative to terminal 16 as shown in Figure 11 2 b Use correct type of extension lead wires or compensating cable Avoid joints in the c...

Page 31: ...1 and 10 of the controller to and RS485 terminals of the Master device To ensure reliable operation of the Serial Communication Link without data corruption due to line noise or reflections use a pair...

Page 32: ...2 wire of the size not smaller than 0 5mm for power supply connections Connect Line Phase supply line to terminal 1 and the Neutral Return supply line to terminal 2 as shown in Figure 11 6 below The...

Page 33: ...d i a n e t Dec 2021 Process Precision Instruments 101 Diamond Industrial Estate Navghar Vasai Road E Dist Palghar 401 210 Maharashtra India Sales 8208199048 8208141446 Support 07498799226 08767395333...

Reviews: