Step 6:
Then, fit the fastening base to the tip of the piston, and fasten it by means
of a M10 x 45 mm screw, as well as a M10 hex nut (provided), according to the
picture below.
Step 7:
With the gate closed, fully extend the piston rod and weld the fastening
base to the gate leaf.
Step 8:
Adjust the stoppers and place the open / close limit switch reeds on the
rail, so that they activate once the gate leaf complete its movement. Fasten the
limit switch reeds by means of the ‘3 x 6’ screws (fixed on the reeds) and connect it
to the control board.
Before running the operator, one must screw the operator housing
by means of the 4 provided 3.5 x 16 mm screws).
CONTROL UNIT:
Check on the product’s lable (as seen
on the picture to the right) which is
the proper control board for this op-
erator. That done, refer to the control
board manual available to download
on
www.ppa.com.br
and perform all
connections and settings accordingly.
Lote:
Código:
Modelo:
Redução:
Tecnologia:
Voltagem:
Central:
Tamanho:
Montagem:
Carenagem:
Engrenagem:
M10 X 45 SCREW
PISTON ROD
FASTENING BASE
M10 NUT
LEFT LEAF
RIGHT LEAF
GATE MOVEMENT
DIRECTION (INWARDS)
STOPPER
STOPPER
LIMIT SWITCH
REEDS