6
7
- The cable used for the wiring must comply with the NBR NM 247-3
standards (Brazil);
- The mains cable (of an internal use product) must be a 3 x (Tri-
rated) 0.75 mm² / 500 V flexible cable, according to the NBR NM
247-5 standards (Brazil);
- The mains cable (of an internal use product) must be a 3 x (Tri-
rated) 0.75 mm² / 500 V flexible cable; according to the IEC 60245-
57 standards (Brazil).
The ground terminal MUST be
connected to the ground wire.
IMPORTANT
The operator must be powered through a Differential Residual
(DR) Current device with a Nominal residual operating current not
exceeding 30 mA.
PRECAUTIONS WITH THE GATE BEFORE
THE INSTALLATION
Before proceeding with the product’s installation, some procedures must be taken:
- Check the movement (opening / closing) of the gate, before the installation;
- Check the effort required to open / close the gate. One must be able to perform it
smoothly on the entirety of its movement. In order to check such effort, move the
gate 80 cm (~2.63 ft) away from the hinge (spot where the operator exerts force to
move the gate);
- The gate must have a resistant and, as far as possible, non-deformable structure.
INSTALLING AND MOUNTING THE
OPERATOR
Before proceeding with the product’s installation, disconnect any
unnecessary cables as well as any devices or systems from the
mains power supply.
In order to install the product, follow the procedures below:
Swing operators are provided to be installed on either the right or the left side of
the gate. Therefore, in order to identify which side is it, follow the procedures:
- Observing the operator, according to the picture below, check the position of the
cable of the motor. If it is to the right, the operator is the right one. If it is to the left,
the operator is the left one.
LEFT
RIGHT