PPA EURUS STEEL 1/2 Technical Manual Download Page 5

4

TECHNICAL CHARACTERISTICS

EURUS STEEL 1/2 - EURUS STEEL 1/2 JET FLEX

EURUS STEEL 1/2 HIGH MOTOR  

OPERATOR TYPE 

Sliding

Sliding

Sliding

MODEL

Single phase

Single phase

Single phase

RATED VOLTAGE

220 V

127 V

220 V / 127 V

NOMINAL 

FREQUENCY

60 Hz

60 Hz

60 Hz

RATED POWER

450 W

395 W

230 W

MOTOR ROTATION

1740 RPM

1740 RPM

4365 RPM

 NOMINAL CHAIN

2,1 A

3,15 A

1,9 A / 2,7 A

REDUCTION

1:30

1:30

1:30

LINEAR SPEED

13,1 m/min

13,1 m/min

32,9 m/min

OPERATIONS

60 cycles/h

60 cycles/h

60 cycles/h

PROTECTION DEGREE

IPX4

IPX4

IPX4

TEMPERATURE 

RANGE

-5° C / +50° C

-5° C / +50° C

-5° C / +50° C

ISOLATION TYPE

Class B, 130° C

Class B, 130° C

Class B, 130° C

LIMIT SWITCH

Hybrid

Hybrid

Hybrid

MAX. GATE LEAF 

MASS

600 Kg

600 Kg

600 Kg

MAXIMUM 

DIMENSION OF THE 

GATE

Heights = 2,5 m 

Length = 6,0 m

Heights = 2,5 m 

Length = 6,0 m

Heights = 2,5 m 

Length = 6,0 m

OPERATOR TYPE

Sliding

Sliding

MODEL

Single phase

Single phase

RATED VOLTAGE

220 V

127 V

NOMINAL FREQUENCY

60 Hz

60 Hz

RATED POWER

380 W

265 W

MOTOR ROTATION

3480 RPM

3480 RPM

MOTOR CHAIN

1,75 A

2,1 A

REDUCTION

1:30

1:30

LINEAR SPEED

26,2 m/min

26,2 m/min

OPERATIONS

60 cycles/h

60 cycles/h

PROTECTION DEGREE

IPX4

IPX4

TEMPERATURE RANGE

-5° C  /  +50° C

-5° C  /  +50° C

ISOLATION TYPE

Class B, 130° C

Class B, 130° C

LIMIT SWITCH

Hybrid

Hybrid

MAX. GATE LEAF MASS

700 Kg

700 Kg

MAXIMUM DIMENSION 

OF THE GATE

Heights = 2,5 m     

Length = 6 m

Heights = 2,5 m     

Length = 6 m

Summary of Contents for EURUS STEEL 1/2

Page 1: ...MOTOPPAR IND STRIA E COM RCIO DE AUTOMATIZADORES LTDA Av Dr Labieno da Costa Machado 3526 Distrito Industrial CEP 17400 000 Gar a SP Brasil www ppa com br 55 14 3407 1000...

Page 2: ...EURUS STEEL 1 2 ATEN O Do not use the product without first read the instruction manual Technical manual...

Page 3: ...ICAL CHARACTERISTICS 4 TOOLS REQUIRED FOR INSTALLATIONS 5 ELETRICAL INSTALLATION 5 CARE WITH ELETRICAL INSTALLATION 6 CARE WITH THE GATE BEFORE OPERATION 7 INSTALLATION AND FIXING THE OPERATOR 8 ANALO...

Page 4: ...ng the operator read and follow all instructions contained in this manual carefully Before installing the operator make sure that the local power supply is compatible with the one on the equipment ide...

Page 5: ...TYPE Class B 130 C Class B 130 C Class B 130 C LIMIT SWITCH Hybrid Hybrid Hybrid MAX GATE LEAF MASS 600 Kg 600 Kg 600 Kg MAXIMUM DIMENSION OF THE GATE Heights 2 5 m Length 6 0 m Heights 2 5 m Length...

Page 6: ...the total turn off device and the operator s connection point 1 2 diameter conduits for external and optional flaps 1 2 diameter conduit for safety photocells required The cable for the fixed wiring...

Page 7: ...e through conduits passing internally through the base of the floor ensuring that none of the wiring conductors are trapped and damaged It is mandatory that the ground is connected to the grounding ca...

Page 8: ...previous operation The gate must have a sturdy and as far as possible non deformable structure The pulleys must be of diameter conforming to the dimensions of the gate be in perfect conditions of runn...

Page 9: ...G OF THE OPERATOR Before installing the automation remove any unnecessary cables and disable any equipment or system connected to the mains EQUIPMENT DIMENSIONS The correct functioning of this equipme...

Page 10: ...ould be at a distance of approximately 20 mm from the face of the door leaf 3rd Step Observing the conditions the fully open position the gate and operator close to the face of the door leaf following...

Page 11: ...Drill for fastening by positioning the operator aligned to the gate Before tightening the S x 2 bolts move the gate making sure that it does not lean against the operator in the course Must this occur...

Page 12: ...igned with the gate It is necessary to leave approximately a clearance of 2 mm between the top of the gear tooth and the rack tooth bottom 7th Step Secure the rack to the entire length of the door lea...

Page 13: ...he length of the sheet In this case provide a cross arm brace so do not skip the teeth on the machine departure 9th Step After fixing the rack definitely fix the operator on the floor or concrete base...

Page 14: ...1st Step With the gate closed place the magnet holder in the rack positioned in front with the REED of the operator This magnet will act as a closing limit switch GATE OPENING RACK MAGNECT SUPORT UPP...

Page 15: ...n the gate and place the other magnet holder on the rack facing the REED operator This magnet will act as an opening limit switch ADJUSTMENT OF THE SUPPORT ADJUSTMENT OF THE SUPPORT MAGNET SUPPORT REE...

Page 16: ...er attaching the magnet holders make the final adjustments by moving them to the right or left depending on the desired setting 4th Step To finalize the installation of the operator it is mandatory be...

Page 17: ...itch defective A Make sure the mains power is turned on correctly B Replace fuse with the same specification C Make sure that there are no objects blocking the gate operation D Replace the limit switc...

Page 18: ...17...

Reviews: