![PPA EURUS STEEL 1/2 Technical Manual Download Page 16](http://html1.mh-extra.com/html/ppa/eurus-steel-1-2/eurus-steel-1-2_technical-manual_1592696016.webp)
15
3rd Step:
Start the engine and see if the REED’s are shutting off properly. If
necessary, invert the connector on the board.
After attaching the magnet holders, make the final adjustments by moving them
to the right or left, depending on the desired setting.
4th Step:
To finalize the installation of the operator, it is mandatory before screwing
the fairing with 2 x 3.5 x 16 mm screws (available in the kit).
ADJUSTMENT OF
THE SUPPORT
ADJUSTMENT OF
THE SUPPORT
Summary of Contents for EURUS STEEL 1/2
Page 18: ...17...