
Page 42 FB8X Service Manual Rev. C, 9/28/10
S E R V I C E A N D C A L I B R A T I O N P R O C E D U R E S
6
6.1.1 Left Cover
The Left Cover is attached
by one M3x6 LG Flat Head Screw
in the Binding Recess (fig 1) and two
M3x10 PAN Head Plastite Screws on
the underside of the machine (fig 2).
To remove the two screws
on the underside of the machine, flip
the binder on its back end (fig 2) to
prevent scratching the top surface of
the binder.
6 . 1 C o v e r s
6.1.2 Right Cover
The Right Cover is attached
by one M3x6 LG Flat Head Screw
in the Binding Recess (fig 1) and
two M3x10 SEM PAN Head Plastite
Screws on the underside of the ma-
chine.
To remove the two screws
on the underside of the machine, flip
the binder on its back end to
prevent scratching the top surface of
the binder.
To fully remove the Right
Cover, remove the three screws
and then unplug the wire harness
connector (fig 2).
Fig 1
Fig 1
After reinstalling the Right Cover, perform the following task:
TASK 1
Turn the binder on and make sure the buttons on the Right Cover function properly.
The focus of these service procedures is to explain how to safely and efficiently remove and replace components
of the binder. Each part of this section deals with a specific component.
Following each of the procedures, may be a list of tasks that must be performed for the procedure to be
completed. The tasks must be completed in the order in which they appear.
Fig 2
TOOLS REQUIRED: #1 Phillips Screwdriver
TOOLS REQUIRED: #1 Phillips Screwdriver
Fig 2