background image

M

OUNTING

The units should be mounted 

as close as possible 

to the panel to be protected. See (page 4) on

Connecting Lead lengths. Conduit, preferably metallic, is to be installed from the suppressor to the
panel. Drill holes in the 

 

Powerware TVSS ZoneMaster PLUS

®

 enclosure only in the designated areas

as shown in recommended  cable dressing illustrations (page 5). Mount the unit in the appropriate
location  using the mounting holes provided on the enclosure.

INCORRECT   INSTALLATION  WILL  IMPAIR THE  EFFECTIVENESS   OF   THE
AC  PANEL  PROTECTORS.

Particularly important is the length of the connecting leads (see pages 4 & 5).

I

NTRODUCTION

This  document  explains how to install the 

Powerware TVSS ZoneMaster PLUS

®

 AC Panel Surge

Protection Devices.

I

NSTALLATION

  I

NSTRUCTIONS

Warning:

 Terminals marked L1, L2, L3, N, GND (where relevant) must be connected respectively

to phase(s) neutral and ground.  Failure to comply may result in danger or damage. See corresponding
diagrams for proper           connections.

I

NSTALLATION

  D

ESCRIPTION

Powerware TVSS ZoneMaster PLUS

®

 units are connected in parallel (or in "shunt" across) the

supply to be protected. The connecting cable does not carry the supply current, only the current
associated with suppressing the transient overvoltage.

2

Summary of Contents for TVSS ZoneMaster PLUS

Page 1: ...ZONEMASTER PLUS AC Panel Transient Voltage Surge Suppressors Installation Instructions User Manual Powerware TVSS...

Page 2: ...ANEL PROTECTORS Particularly important is the length of the connecting leads see pages 4 5 INTRODUCTION This document explains how to install the Powerware TVSS ZoneMaster PLUS AC Panel Surge Protecti...

Page 3: ...TVSS ZoneMaster PLUS units have comprehensive continuous visual status monitoring present on each module REMOTE INDICATORS A remote indication of the reduced protection state is available as a normal...

Page 4: ...COMMENDED WIRE GAUGE Minimum of 8 AWG Maximum of 4 AWG for ease of dressing LENGTH OF CONNECTING LEADS The longer the connecting leads between the the ZoneMaster PLUS and power panel the higher the re...

Page 5: ...5 RECOMMENDED CABLE DRESSING...

Page 6: ...tic Connection Diagrams 6 120 240V SPLIT PHASE 3 W THREE PHASE 4W WYE THREE PHASE HIGH LEG DELTA NOTE L2 is designated as the HIGH LEG An optional breaker or disconnect may be used for overcurrent pro...

Page 7: ...from the counter and reinstalled to the ZoneMaster PLUS wire lug Note If it is desired to measure surge currents on only a single individual phase insert selected phase connection wire through the tor...

Page 8: ...lacement WARNING Before opening the access panel ensure that the AC supply has been disconnected Unplug the remote contact connector at the side of the module Remove the mounting screws on the module...

Reviews: