
1 of 1
CONDUIT AND WIRE ENTRY LOCATIONS
062504
A
164201535---6
DESCRIPTION:
DATE:
DRAWING NO:
SHEET:
REVISION:
REMOVE DEBRIS SHIELD
COVERING EXHAUST GRILL
BEFORE OPERATING SYSTEM.
(SHIELD NOT SHOWN FOR
CLARITY).
TOP ENTRY CONDUIT
LANDING FOR AC INPUT AND
OUTPUT, DC INPUT, DC
CONTROL, AND INTERFACE
CONNECTIONS.
(REMOVE PANEL TO DRILL
OR PUNCH CONDUIT
HOLES.)
BOTTOM ENTRY CONDUIT
LANDING FOR AC INPUT AND
OUTPUT, DC INPUT, DC
CONTROL, AND INTERFACE
CONNECTIONS.
(REMOVE PANEL TO DRILL
OR PUNCH CONDUIT
HOLES.)
CONDUIT LANDINGS FOR
X---SLOT CONNECTIONS.
(REMOVE PANELS TO DRILL
OR PUNCH CONDUIT
HOLES.)
TOP VIEW
BOTTOM VIEW
Installation Information
A-14
Powerware
®
9390 UPS (40–80 kVA) Installation and Operation Manual
S
164201535 Rev A
Summary of Contents for 9390
Page 1: ...9390 INSTALLATION OPERATION MANUAL UPS 40 80 kVA www powerware com ...
Page 137: ......
Page 138: ... 164201535A 164201535 A ...