background image

CONTROL BOX

9

The safety photocells are security devices for control automatic gates. Consist of one transmitter and one receiver 

based in waterproof covers; it is triggered while breaking the path of the beams. 

INSTALLATION:

Wire Connection of PH-2 Photocells 
TX: Connect terminals 1 and 2 on the transmitter with the terminals G and +12V on the PC170 PCB. 
RX: Connect terminals 1, 2 and 4 on the receiver with the terminals G, FO+ and FO1 on the PC170.  
And use an extra wire to connect terminals 2 and 5 on the receiver as a bridge.

Detection Method
Sensing Range
Input Voltage
Response Time
Emitting Element
Operation Indicator
Dimensions
Output Method
Current Consumption Max

Water Proof

Through Beam
25M
AC/DC 12~24V
100MS
IR LED
Red LED(RX): ON(When Beam is Broken), Green(TX):ON
96*45*43mm
Relay Output
TX: 35MA/Rx: 38MA (When beam aligned properly);
TX: 35MA/ Rx: 20MA (When beam is broken)
IP54

4. PHOTOCELL INSTALLATION GUIDE

RX

RX

Lens

Beam Alignmnet

Indicator

Power Led

Indicator

Terminal Block

Power

Terminal Block

COM

N.C.

N.O.

GND

DC (12~24V)

GND

DC (12~24V)

TX

TX

SPECIFICATION:

Figure 4(3)

Figure 4(2)

Figure 4(1)

1    2    3    4    5

1    2    3    4    5

1    2 

1    2

Summary of Contents for PC170

Page 1: ...FOR RESIDENTIAL USER MANUAL PC170 Control Box 24V DC GEAR MOTOR ...

Page 2: ...P 2 PHOTO2 2 2 2 CLOSE DELAY OF DUALGATE OPERATIONADJUSTMENT DIP 3 DELAY1 DIP 4 DELAY2 2 2 3 ELECTRIC LATCHADJUSTMENT DIP 5 LATCH 2 2 4 DECELERATION SPEEDADJUSTMENT OF THE GEAR MOTORS DIP 6 D SPEED 2 2 5 OPERATION SPEEDADJUSTMENT OF THE GEAR MOTORS DIP 7 O SPEED 2 2 6 SINGLEAND DUALGATE OPERATIONADJUSTMENT DIP 8 DS SET 2 3 LED INDICATION 2 4 TRANSMITTER MEMORIZE 2 5 SYSTEM LEARNING PROCESS 2 6 GAT...

Page 3: ...L on the PCB 2 Electric Latch Connect the two wires from the electric latch to the terminal Lo and Lo on the PCB 3 Gate openers Refer to Figure 1 4 and connect the wires separately to the terminals on the PCB Motor 1 Connect the motor wire White to the terminals Mo1 and Yellow to the Mo1 Motor 2 Connect the motor wire White to the terminals Mo2 and Yellow to the Mo2 Notes For gates opened outward ...

Page 4: ...15 16 17 Figure 1 4 M1 Key Selector Push Button Latch Flashing Light M2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Transformer Antenna LED1 LED2 LED3 LED4 7 6 1 2 3 4 10 8 9 5 CONTROL BOX 2 TX1 TX2 RX1 RX2 ...

Page 5: ...F Dip Switch 6 ON Dip Switch 6 OFF Dip Switch 6 ON Dip Switch 6 OFF Dip Switch 6 ON Dip Switch 6 OFF Dip Switch 6 ON No auto close 3 sec 10 sec 20 sec 40 sec 60 sec 120 sec 360 sec Auto C1 Auto C2 Auto C3 Effect Note Auto close mode activates when the gates move to the end position or stopped manually If the transmitter push button or the key selector is activated before the auto close counting th...

Page 6: ...MOVING CLOSING OPENING Safety Device2 Safety Edge Open not allowed Locks Reverse to open for 2 seconds Reverse to clsoe for 2 seconds Reload automatic closing time Safety Device1 Photocell CLOSE No effect Reload automatic closing time Open No effect Position of Gate When safety devices are activated 3 SW2_2 SW2_1 ON OFF Type of Safety Device FULLY CLOSED FULLY OPENED STOP DURING MOVING CLOSING OPE...

Page 7: ... once command the remote then unlock the latch to open the gate OFF Once command the remote the the latch will be unlocked to open the gate immediately 2 2 4 DECELARATION SPEEDADJUSTMENT OF THE GEAR MOTORS DIP 6 D SPEED ON The speed is 70 output of the full speed OFF The speed is 50 output of the full speed 2 3 LED INDICATION LED1 System Learning LED1 is always ON when the system learning in not c...

Page 8: ...Master Gate Open Master Gate Close 1 1 5 2 3 1 2 3 4 6 2 3 1 2 3 4 5 6 CAUTION Before proceeding to system learning the transmitter memorizing process has to be completed Beware The system learning process for single gate takes more than dual gate for around 1 min wait for the gate to complete the learning process A B A B 2 4 TRANSMITTER MEMORIZING PROCESS Press RF learn button for 2 seconds and t...

Page 9: ...purpose the gates stop if encountering obstacles 2 8 ADVANCED OPERATION OF THE TRANSMITTER SW3 DIP1 2 REMOTE 1 REMOTE2 A PR 1 PR 2 Situation 1 Dip1 Remote 1 ON Dip2 Remote 2 ON Transmitter button A for single leaf operation Transmitter button B for double leaves operation Situation 2 Dip1 Remote 1 ON Dip2 Remote 2 OFF Transmitter button B for single leaf operation Transmitter button A for double l...

Page 10: ...the hall sensor is firm Make sure the connecting terminals of the Antenna is firm Check the dip switch setting of the speed adjustment Check if the wiring connection of the flashing light is correct Change the polarity connection of the positive with the negative of the gear motors 1 Check if the RESET socket is activated 2 Make sure the wiring connection of the gear motors is firm 3 Make sure the...

Page 11: ... wire to connect terminals 2 and 5 on the receiver as a bridge Detection Method Sensing Range Input Voltage Response Time Emitting Element Operation Indicator Dimensions Output Method Current Consumption Max Water Proof Through Beam 25M AC DC 12 24V 100MS IR LED Red LED RX ON When Beam is Broken Green TX ON 96 45 43mm Relay Output TX 35MA Rx 38MA When beam aligned properly TX 35MA Rx 20MA When bea...

Page 12: ...34100 093 01 B ...

Reviews: