PowerStar SMX2000RMLV2U Operation Manual Download Page 6

Smart-UPS X-Series 2000/2200/3000 VA  Operation

4

Operation

Connect Equipment to the UPS

Note:

 The UPS will charge to 90% capacity in the first three hours of normal operation. 

Do 

not expect full battery runtime capability during this initial charge period.

1. Connect equipment to the outlets on the rear panel of the UPS. 

Do not use extension cords, plug

equipment directly into the UPS.

2. Connect the UPS to the building utility power. 

Connect the UPS to a two-pole, three-wire,

grounded source only.

3. Press the 

O

N

/O

FF

 button on the front panel of the UPS to apply power to the unit and all connected

equipment.

4. To use the UPS as a master on/off switch, turn on all the equipment that is connected to the UPS.

See “Switched Outlet Groups” on page 11 for information on how to use the Switched Outlet 
Groups.

Basic Connections

Serial port: 

Connect to a computer to use power management software, use the 

serial cable included with the unit. 

USB port:

 Connect to a computer to use power management software. 

Note: 

Serial and USB communication can only be used individually, they cannot 

communicate at the same time.

External Battery Pack connector: 

Connect external battery packs to provide 

extended runtime during power outages. The UPS can detect up to 10 external 
battery packs.

Ground Screw: 

The UPS features a ground screw for connecting the ground leads 

on transient voltage devices. When connecting a grounding cable, disconnect the 
UPS from utility power.

s

u

04

75

a

Summary of Contents for SMX2000RMLV2U

Page 1: ...Operation Smart UPS X UPS Low Voltage 100 127 V SMX2000RMLV2U SMX2200RMLV2U SMX3000RMLV2U SMX3000RMLV2UNC High Voltage 200 240 V SMX2200RMHV2U SMX3000RMHV2U SMX3000RMHV2UNC shipboard PS6003rm2u...

Page 2: ...Safety 1 Product Overview 1 Specifications 2 Installation 3 Operation 4 Connect Equipment to the UPS 4 Display Interface 5 Configuration 8 UPS Settings 8 Switched Outlet Groups 11 Emergency Power Off...

Page 3: ...PS has both high voltage 200 240 V and low voltage 100 127 V models Safety Read the Safety Guide included in the package before installing the UPS Inspect the UPS upon receipt Notify the carrier and d...

Page 4: ...e High temperatures poor utility power and frequent short duration discharges will shorten battery life For additional specifications see the APC Web site at www apc com Smart slot Controllable Outlet...

Page 5: ...agement Card For installation information see the user manual provided with the Network Management Card NMC The user manual is also available on the APC Web site at www apc com External Battery Pack F...

Page 6: ...a master on off switch turn on all the equipment that is connected to the UPS See Switched Outlet Groups on page 11 for information on how to use the Switched Outlet Groups Basic Connections Serial p...

Page 7: ...e advanced users to configure additional features of the unit Note Actual menu screens may differ by model Online indicator UPS Output On Off button On Battery indicator Fault indicator Replace Batter...

Page 8: ...x Audible alarms x x High and low transfer points x Low run time warning x Green mode x Output voltage x x Battery self test interval x x Battery installation date x x UPS firmware only available when...

Page 9: ...utput voltage setting serial number manufacture date replacement battery cartridge information firmware versions and suggested battery replacement date x x Smart Slot card information if applicable in...

Page 10: ...20 V 100 110 120 127 Set the nominal output voltage of the UPS is off High Voltage 230 V 200 208 220 230 240 Input Power Quality Good Good Fair Poor Select the quality of input utility power If Good i...

Page 11: ...Y setting will automatically change this setting Note Use the Advanced Menus to configure this setting 100 V 92 Vac 86 92 Vac 110 V 98 Vac 89 98 Vac 120 V 106 Vac 97 106 Vac 127 V 112 Vac 103 112 Vac...

Page 12: ...e display buttons are pressed Auto Self Test Interval Setting On start up and every 14 days since the last test Last test 14 days Last test 7 days Turn on 14 days Turn on 7 days On startup only Never...

Page 13: ...critical equipment to a Switched Outlet Group 2 Connect peripheral equipment to the other Switched Outlet Groups During a power outage to conserve battery runtime non essential equipment can be confi...

Page 14: ...lay Disabled When the unit switches to battery power the UPS can disconnect power to the Switched Outlet Groups to save runtime Configure this delay time use the LOAD SHED TIME WHEN ON BATTERY setting...

Page 15: ...1 is the power source for the EPO circuit it provides a few milliampere of 24 V power If the normally closed NC EPO configuration is used the EPO switch or relay should be rated for dry circuit appli...

Page 16: ...battery is weak due to a recent outage or is near the end of its service life Charge the battery Batteries require recharging after extended outages and wear out faster when put into service often or...

Page 17: ...nce with U S Department of Transportation DOT and IATA regulations The battery may remain in the unit c Internal batteries may remain connected in the XLBP during shipment if applicable not all units...

Page 18: ...D NO OBLIGATION OR LIABILITY WILL ARISE OUT OF APC s RENDERING OF TECHNICAL OR OTHER ADVICE OR SERVICE IN CONNECTION WITH THE PRODUCTS THE FOREGOING WARRANTIES AND REMEDIES ARE EXCLUSIVE AND IN LIEU O...

Page 19: ...APC by Schneider Electric APC the APC logo are owned by Schneider Electric Industries S A S American Power Conversion Corporation or their affiliated companies All other trademarks are property of th...

Reviews: