Be careful to assemble all components in the sequence they are presented.
S T E P
7
High Pulley Cable (90)
Ball Stop End
Metal Ball End
Note:
All Pulleys in this step are 4 1/4” diameter, except where noted in step 7B and 7C.
Leave all pulley bolts hand tight until step 10 is completed.
Earlier versions of the P1 used 3 1/2” diameter pulleys in some areas instead of 4 1/4” diameter pulleys. These pulleys are
already installed and the cable installation procedure is the same for both pulley sizes.
A.
See Diagram 1. Begin at the high pulley station. Route the metal ball end of the High Pulley Cable (90)
up and through the opening where Pulley (A1) will be installed and then down through the next
opening where Pulley (A2) will be installed.
B.
See Diagram 2. Install 31/2” diameter Pulley (A1) under Cable (90) and into Upper Main Frame (D) as
shown using:
One 52 (10mm x 95mm hex head bolt) - No. 6 on hardware card 1
Two 14 (pulley spacer)
One 70 (10mm nylon lock nut) - No. 18 on hardware card 3
C.
See Diagram 2. Install Pulley (A2) under Cable (90) and into Upper Main Frame (D) as
shown using:
One 52 (10mm x 95mm hex head bolt) - No. 6 on hardware card 1
Two 14 (pulley spacer)
One 70 (10mm nylon lock nut) - No. 18 on hardware card 3
D.
See Diagram 1. Route Cable (90) over the top and around pre-installed Pulley (A3) as shown.
Route Cable (90) around Pulley (A4) and install Pulley (A4) into Upper Main Frame (D) as shown in
diagram 2 using:
One 52 (10mm x 95mm hex head bolt) - No. 6 on hardware card 1
Two 14 (pulley spacer)
One 70 (10mm nylon lock nut) - No. 18 on hardware card 3
E.
See Diagram 1. Route Cable (90) between Pulley (A3) and pre-installed Pulley (A5).
Route Cable (90) over the top and around Pulley (A5) and back through Frame (D).
Route Cable (90) down through the small arm sticking out of the Upper Main Frame (D).
And pull entire length of Cable through.
F.
See Diagram 2. Install Pulley (A6) under Cable (90) and into arm sticking out of the Upper Main
Frame (D) using:
One 54 (10mm x 55mm hex head bolt) - No. 4 on hardware card 3
Two 14 (pulley spacer)
One 70 (10mm nylon lock nut) - No. 18 on hardware card 3
Cable (90) should be hanging down through the bottom of the small arm sticking out of the
Upper Main Frame (D).
G.
See Diagram 2. Attach Press Arm Pulley Shroud (U) to Press Arm Pivot (Q) as shown and tighten.
20
Summary of Contents for P1.1x
Page 1: ......
Page 8: ......
Page 9: ......
Page 11: ...7...
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 25: ......
Page 27: ...7 JHISL PUZ HSSH PVU JHISL PUZ HSSH PVU W SSL PUZ HSSH PVU...
Page 29: ......
Page 41: ...2...
Page 42: ......
Page 43: ...1...
Page 44: ...1...
Page 45: ...1...
Page 58: ......
Page 59: ......
Page 60: ......
Page 62: ......
Page 63: ...SPACER...
Page 64: ......
Page 65: ......
Page 66: ......
Page 69: ......