26
Maintenance and Care
System Maintenance II
The following maintenance work must
be performed by an authorized Power-
Boss Service workshop.
To be performed
Interval
every 250 hours of operation
Perform maintenance works according to System Maintenance I
o
Inspect steering rollers for tread damages and bearing slackness and replace if
required
o
Check drain hose of the recovery tank and replace if required
o
Check roller bumperof the brush deck and replace if required
o
Check suction hose for tight fit and damages and replace if required
o
Check supporting wheel of the squeegee and replace if required
o
Test drive and function test
o
Summary of Contents for Phoenix 24
Page 1: ...User Manual Phoenix 24...
Page 39: ...39 Maintenance and Care NOTES...
Page 40: ...40 Maintenance and Care...
Page 41: ...41 Maintenance and Care...