11
4111-0034 — Sept. 2018
© 2018 Systems, LLC
Air Supply Requirements
INSTALLATION
# of Levelers
Recommended Compressor
1-4
1.5HP, 20GAL, 5.2CFM @ 90PSI
5 or more
5HP, 60GAL, 14.2CFM @ 125 PSI
Compressor pump must be filled with appropriate
oil prior to initial start up. Refer to the compressor
manufacturer's manual for proper startup and
maintenance procedures.
Kit
#
6106
‐
0017
&
6106
‐
0027
6106
‐
0018
&
6106
‐
0028
6106
‐
0018
&
6106
‐
0028
MISC
PARTS
REQUIRED
FOR
INSTALLATION
OF
CENTRA
AIR
DOCK
LEVELERS
Underground
air
supply
New
construction
lever
operated
valve
6106
‐
0013
Kit
#
6106
‐
0014
Kit
#
Overhead
air
supply
New
construction
lever
operated
valve
electric
push
button
pneumatic
push
button
6106
‐
0015
6106
‐
0015
6106
‐
0016
pneumatic
push
button
electric
push
button
6106
‐
0016
Overhead
air
supply
Retrofit
pneumatic
push
button
electric
push
button
lever
operated
valve
KIT
NU
MB
ER
3/
8"
tub
ing
R9
85
‐
00
01
1/
2"
tub
ing
R9
84
‐
00
01
Ftg
1/
2"
NP
T
to
3/
8"
tbg
93
01
‐
02
42
Ftg
3/
8"
un
ion
elb
ow
93
01
‐
02
41
Ftg
3/
8"
un
ion
tee
93
01
‐
02
44
Ftg
1/
2"
un
ion
tee
93
01
‐
02
60
Sh
ut
off
‐
1/
2"
tee
ftg
&
3/
8"
str
ftg
‐
61
06
‐
00
26
Sh
ut
off
‐
1/
2"
&
3/
8"
str
ftg
s
‐
61
06
‐
00
12
Sh
ut
off
‐
1/
2"
&
3/
8"
tee
ftg
s
‐
61
06
‐
00
23
Sh
ut
off
‐
1/
2"
str
ftg
&
3/
8"
tee
ftg
‐
61
06
‐
00
29
Sh
ut
off
‐
3/
8"
ftg
s
61
06
‐
00
08
1/
2"
Tu
be
Cla
mp
rub
ber
cu
sh
ion
ed
‐
21
01
‐
02
60
6106
‐
0013
30'
1
1
2
6106
‐
0014
30'
1
5
1
6
6106
‐
0015
60'
1
1
1
4
6106
‐
0016
60'
1
10
1
1
12
6106
‐
0017
3'
TBD
1
(See
note
1)
6106
‐
0027
3'
TBD
1
6106
‐
0018
60'
TBD
1
4
(See
note
1)
6106
‐
0028
60'
TBD
1
4
(See
note
2)
6106
‐
0030
2
Revision
C
Revised
8/23/2017
NOTES:
‐
All
applications
should
be
reviewed
with
engineering
to
ensure
standard
kits
listed
above
will
work.
‐
The
amount
of
1/2"
tubing
varies
by
job.
It's
based
on
the
door
centerline
and
the
distance
to
the
compressor
feed
line
fitting.
‐
Slit
tubing
R801
‐
0001
can
be
used
to
slide
over
3/8"
tubing
if
requested
for
additional
UV
protection.
Not
included
in
kits.
1.
Kits
6106
‐
0027
&
6106
‐
0028
are
to
be
used
at
the
end
of
a
row
of
loading
docks
for
single
1/2"
air
supply
line.
For
air
supply
systems
using
(2)
1/2"
air
supply
lines
(loop
system),
use
6106
‐
0017
or
6106
‐
0018
on
the
end
loading
docks
as
well.
2.
Kit
to
be
used
with
loop
system
air
supply
‐
(using
(2)
1/2"
air
supply
lines).
One
kit
to
be
used
for
every
three
loading
docks.
Kit
#
6106
‐
0017
&
6106
‐
0027
6106
‐
0018
&
6106
‐
0028
6106
‐
0018
&
6106
‐
0028
MISC
PARTS
REQUIRED
FOR
INSTALLATION
OF
CENTRA
AIR
DOCK
LEVELERS
Underground
air
supply
New
construction
lever
operated
valve
6106
‐
0013
Kit
#
6106
‐
0014
Kit
#
Overhead
air
supply
New
construction
lever
operated
valve
electric
push
button
pneumatic
push
button
6106
‐
0015
6106
‐
0015
6106
‐
0016
pneumatic
push
button
electric
push
button
6106
‐
0016
Overhead
air
supply
Retrofit
pneumatic
push
button
electric
push
button
lever
operated
valve
KIT
NU
MB
ER
3/
8"
tub
ing
R9
85
‐
00
01
1/
2"
tub
ing
R9
84
‐
00
01
Ftg
1/
2"
NP
T
to
3/
8"
tbg
93
01
‐
02
42
Ftg
3/
8"
un
ion
elb
ow
93
01
‐
02
41
Ftg
3/
8"
un
ion
tee
93
01
‐
02
44
Ftg
1/
2"
un
ion
tee
93
01
‐
02
60
Sh
ut
off
‐
1/
2"
tee
ftg
&
3/
8"
str
ftg
‐
61
06
‐
00
26
Sh
ut
off
‐
1/
2"
&
3/
8"
str
ftg
s
‐
61
06
‐
00
12
Sh
ut
off
‐
1/
2"
&
3/
8"
tee
ftg
s
‐
61
06
‐
00
23
Sh
ut
off
‐
1/
2"
str
ftg
&
3/
8"
tee
ftg
‐
61
06
‐
00
29
Sh
ut
off
‐
3/
8"
ftg
s
61
06
‐
00
08
1/
2"
Tu
be
Cla
mp
rub
ber
cu
sh
ion
ed
‐
21
01
‐
02
60
6106
‐
0013
30'
1
1
2
6106
‐
0014
30'
1
5
1
6
6106
‐
0015
60'
1
1
1
4
6106
‐
0016
60'
1
10
1
1
12
6106
‐
0017
3'
TBD
1
(See
note
1)
6106
‐
0027
3'
TBD
1
6106
‐
0018
60'
TBD
1
4
(See
note
1)
6106
‐
0028
60'
TBD
1
4
(See
note
2)
6106
‐
0030
2
Revision
C
Revised
8/23/2017
NOTES:
‐
All
applications
should
be
reviewed
with
engineering
to
ensure
standard
kits
listed
above
will
work.
‐
The
amount
of
1/2"
tubing
varies
by
job.
It's
based
on
the
door
centerline
and
the
distance
to
the
compressor
feed
line
fitting.
‐
Slit
tubing
R801
‐
0001
can
be
used
to
slide
over
3/8"
tubing
if
requested
for
additional
UV
protection.
Not
included
in
kits.
1.
Kits
6106
‐
0027
&
6106
‐
0028
are
to
be
used
at
the
end
of
a
row
of
loading
docks
for
single
1/2"
air
supply
line.
For
air
supply
systems
using
(2)
1/2"
air
supply
lines
(loop
system),
use
6106
‐
0017
or
6106
‐
0018
on
the
end
loading
docks
as
well.
2.
Kit
to
be
used
with
loop
system
air
supply
‐
(using
(2)
1/2"
air
supply
lines).
One
kit
to
be
used
for
every
three
loading
docks.
Kit
#
6106
‐
0017
&
6106
‐
0027
6106
‐
0018
&
6106
‐
0028
6106
‐
0018
&
6106
‐
0028
MISC
PARTS
REQUIRED
FOR
INSTALLATION
OF
CENTRA
AIR
DOCK
LEVELERS
Underground
air
supply
New
construction
lever
operated
valve
6106
‐
0013
Kit
#
6106
‐
0014
Kit
#
Overhead
air
supply
New
construction
lever
operated
valve
electric
push
button
pneumatic
push
button
6106
‐
0015
6106
‐
0015
6106
‐
0016
pneumatic
push
button
electric
push
button
6106
‐
0016
Overhead
air
supply
Retrofit
pneumatic
push
button
electric
push
button
lever
operated
valve
KIT
NU
MB
ER
3/
8"
tub
ing
R9
85
‐
00
01
1/
2"
tub
ing
R9
84
‐
00
01
Ftg
1/
2"
NP
T
to
3/
8"
tbg
93
01
‐
02
42
Ftg
3/
8"
un
ion
elb
ow
93
01
‐
02
41
Ftg
3/
8"
un
ion
tee
93
01
‐
02
44
Ftg
1/
2"
un
ion
tee
93
01
‐
02
60
Sh
ut
off
‐
1/
2"
tee
ftg
&
3/
8"
str
ftg
‐
61
06
‐
00
26
Sh
ut
off
‐
1/
2"
&
3/
8"
str
ftg
s
‐
61
06
‐
00
12
Sh
ut
off
‐
1/
2"
&
3/
8"
tee
ftg
s
‐
61
06
‐
00
23
Sh
ut
off
‐
1/
2"
str
ftg
&
3/
8"
tee
ftg
‐
61
06
‐
00
29
Sh
ut
off
‐
3/
8"
ftg
s
61
06
‐
00
08
1/
2"
Tu
be
Cla
mp
rub
ber
cu
sh
ion
ed
‐
21
01
‐
02
60
6106
‐
0013
30'
1
1
2
6106
‐
0014
30'
1
5
1
6
6106
‐
0015
60'
1
1
1
4
6106
‐
0016
60'
1
10
1
1
12
6106
‐
0017
3'
TBD
1
(See
note
1)
6106
‐
0027
3'
TBD
1
6106
‐
0018
60'
TBD
1
4
(See
note
1)
6106
‐
0028
60'
TBD
1
4
(See
note
2)
6106
‐
0030
2
Revision
C
Revised
8/23/2017
NOTES:
‐
All
applications
should
be
reviewed
with
engineering
to
ensure
standard
kits
listed
above
will
work.
‐
The
amount
of
1/2"
tubing
varies
by
job.
It's
based
on
the
door
centerline
and
the
distance
to
the
compressor
feed
line
fitting.
‐
Slit
tubing
R801
‐
0001
can
be
used
to
slide
over
3/8"
tubing
if
requested
for
additional
UV
protection.
Not
included
in
kits.
1.
Kits
6106
‐
0027
&
6106
‐
0028
are
to
be
used
at
the
end
of
a
row
of
loading
docks
for
single
1/2"
air
supply
line.
For
air
supply
systems
using
(2)
1/2"
air
supply
lines
(loop
system),
use
6106
‐
0017
or
6106
‐
0018
on
the
end
loading
docks
as
well.
2.
Kit
to
be
used
with
loop
system
air
supply
‐
(using
(2)
1/2"
air
supply
lines).
One
kit
to
be
used
for
every
three
loading
docks.
Kit
#
6106
‐
0017
&
6106
‐
0027
6106
‐
0018
&
6106
‐
0028
6106
‐
0018
&
6106
‐
0028
MISC
PARTS
REQUIRED
FOR
INSTALLATION
OF
CENTRA
AIR
DOCK
LEVELERS
Underground
air
supply
New
construction
lever
operated
valve
6106
‐
0013
Kit
#
6106
‐
0014
Kit
#
Overhead
air
supply
New
construction
lever
operated
valve
electric
push
button
pneumatic
push
button
6106
‐
0015
6106
‐
0015
6106
‐
0016
pneumatic
push
button
electric
push
button
6106
‐
0016
Overhead
air
supply
Retrofit
pneumatic
push
button
electric
push
button
lever
operated
valve
KIT
NU
MB
ER
3/
8"
tub
ing
R9
85
‐
00
01
1/
2"
tub
ing
R9
84
‐
00
01
Ftg
1/
2"
NP
T
to
3/
8"
tbg
93
01
‐
02
42
Ftg
3/
8"
un
ion
elb
ow
93
01
‐
02
41
Ftg
3/
8"
un
ion
tee
93
01
‐
02
44
Ftg
1/
2"
un
ion
tee
93
01
‐
02
60
Sh
ut
off
‐
1/
2"
tee
ftg
&
3/
8"
str
ftg
‐
61
06
‐
00
26
Sh
ut
off
‐
1/
2"
&
3/
8"
str
ftg
s
‐
61
06
‐
00
12
Sh
ut
off
‐
1/
2"
&
3/
8"
tee
ftg
s
‐
61
06
‐
00
23
Sh
ut
off
‐
1/
2"
str
ftg
&
3/
8"
tee
ftg
‐
61
06
‐
00
29
Sh
ut
off
‐
3/
8"
ftg
s
61
06
‐
00
08
1/
2"
Tu
be
Cla
mp
rub
ber
cu
sh
ion
ed
‐
21
01
‐
02
60
6106
‐
0013
30'
1
1
2
6106
‐
0014
30'
1
5
1
6
6106
‐
0015
60'
1
1
1
4
6106
‐
0016
60'
1
10
1
1
12
6106
‐
0017
3'
TBD
1
(See
note
1)
6106
‐
0027
3'
TBD
1
6106
‐
0018
60'
TBD
1
4
(See
note
1)
6106
‐
0028
60'
TBD
1
4
(See
note
2)
6106
‐
0030
2
Revision
C
Revised
8/23/2017
NOTES:
‐
All
applications
should
be
reviewed
with
engineering
to
ensure
standard
kits
listed
above
will
work.
‐
The
amount
of
1/2"
tubing
varies
by
job.
It's
based
on
the
door
centerline
and
the
distance
to
the
compressor
feed
line
fitting.
‐
Slit
tubing
R801
‐
0001
can
be
used
to
slide
over
3/8"
tubing
if
requested
for
additional
UV
protection.
Not
included
in
kits.
1.
Kits
6106
‐
0027
&
6106
‐
0028
are
to
be
used
at
the
end
of
a
row
of
loading
docks
for
single
1/2"
air
supply
line.
For
air
supply
systems
using
(2)
1/2"
air
supply
lines
(loop
system),
use
6106
‐
0017
or
6106
‐
0018
on
the
end
loading
docks
as
well.
2.
Kit
to
be
used
with
loop
system
air
supply
‐
(using
(2)
1/2"
air
supply
lines).
One
kit
to
be
used
for
every
three
loading
docks.
Kit
#
6106
‐
0017
&
6106
‐
0027
6106
‐
0018
&
6106
‐
0028
6106
‐
0018
&
6106
‐
0028
MISC
PARTS
REQUIRED
FOR
INSTALLATION
OF
CENTRA
AIR
DOCK
LEVELERS
Underground
air
supply
New
construction
lever
operated
valve
6106
‐
0013
Kit
#
6106
‐
0014
Kit
#
Overhead
air
supply
New
construction
lever
operated
valve
electric
push
button
pneumatic
push
button
6106
‐
0015
6106
‐
0015
6106
‐
0016
pneumatic
push
button
electric
push
button
6106
‐
0016
Overhead
air
supply
Retrofit
pneumatic
push
button
electric
push
button
lever
operated
valve
KIT
NU
MB
ER
3/
8"
tub
ing
R9
85
‐
00
01
1/
2"
tub
ing
R9
84
‐
00
01
Ftg
1/
2"
NP
T
to
3/
8"
tbg
93
01
‐
02
42
Ftg
3/
8"
un
ion
elb
ow
93
01
‐
02
41
Ftg
3/
8"
un
ion
tee
93
01
‐
02
44
Ftg
1/
2"
un
ion
tee
93
01
‐
02
60
Sh
ut
off
‐
1/
2"
tee
ftg
&
3/
8"
str
ftg
‐
61
06
‐
00
26
Sh
ut
off
‐
1/
2"
&
3/
8"
str
ftg
s
‐
61
06
‐
00
12
Sh
ut
off
‐
1/
2"
&
3/
8"
tee
ftg
s
‐
61
06
‐
00
23
Sh
ut
off
‐
1/
2"
str
ftg
&
3/
8"
tee
ftg
‐
61
06
‐
00
29
Sh
ut
off
‐
3/
8"
ftg
s
61
06
‐
00
08
1/
2"
Tu
be
Cla
mp
rub
ber
cu
sh
ion
ed
‐
21
01
‐
02
60
6106
‐
0013
30'
1
1
2
6106
‐
0014
30'
1
5
1
6
6106
‐
0015
60'
1
1
1
4
6106
‐
0016
60'
1
10
1
1
12
6106
‐
0017
3'
TBD
1
(See
note
1)
6106
‐
0027
3'
TBD
1
6106
‐
0018
60'
TBD
1
4
(See
note
1)
6106
‐
0028
60'
TBD
1
4
(See
note
2)
6106
‐
0030
2
Revision
C
Revised
8/23/2017
NOTES:
‐
All
applications
should
be
reviewed
with
engineering
to
ensure
standard
kits
listed
above
will
work.
‐
The
amount
of
1/2"
tubing
varies
by
job.
It's
based
on
the
door
centerline
and
the
distance
to
the
compressor
feed
line
fitting.
‐
Slit
tubing
R801
‐
0001
can
be
used
to
slide
over
3/8"
tubing
if
requested
for
additional
UV
protection.
Not
included
in
kits.
1.
Kits
6106
‐
0027
&
6106
‐
0028
are
to
be
used
at
the
end
of
a
row
of
loading
docks
for
single
1/2"
air
supply
line.
For
air
supply
systems
using
(2)
1/2"
air
supply
lines
(loop
system),
use
6106
‐
0017
or
6106
‐
0018
on
the
end
loading
docks
as
well.
2.
Kit
to
be
used
with
loop
system
air
supply
‐
(using
(2)
1/2"
air
supply
lines).
One
kit
to
be
used
for
every
three
loading
docks.
The CA dock leveler will not function correctly with
less than 80 psi available at the regulator.
For ideal
operation, 95 psi is recommended.
Installation Kits
Summary of Contents for CentraAir
Page 21: ...19 4111 0034 Sept 2018 2018 Systems LLC This page intentionally left blank INSTALLATION...
Page 53: ...51 4111 0034 Sept 2018 2018 Systems LLC PARTS This page intentionally left blank...
Page 54: ...52 4111 0034 Sept 2018 2018 Systems LLC MISCELLANEOUS This page intentionally left blank...