![Power Storage Solutions 12MQ100 - 620 Installation & Operation Manual Download Page 16](http://html1.mh-extra.com/html/power-storage-solutions/12mq100-620/12mq100-620_installation-and-operation-manual_1587758016.webp)
7.2.4 Basic requirements and
pre
cautions on maintenance
routines
:
1)
Principle
to discover areas of concern
and insure the safe
operation.
Should be
documented
while
test
ing
the batter
ies
.
2)
Preventative
maintenance and performance analysis should be carried out
routinely
.
3)
Battery parameter
and
operation should be complied with the maintenance
documentation
and
re
viewed
.
4)
Always wear insulated gloves when handling the batteries to avoid electric shock. Make
tools
and
instrument
s are properly
insulated.
5)
Use
calibrated
instrument and meters which meet test requirement.
6)
Physical articles:
a)
Check whether the post and connection is clean, w
ith no
appearance of
oxidation or
corrosion.
Clean and lubricate connections to
reduce the resistance.
b)
Check for any loose connection
s
, if any
tighten per specification in previous torque tables
.
c)
Check if there is any appearance of acid
seepage
,
pooling
of liquid,
or
liquid around the
safety valve.
d)
Check if there is any damage, leakage and distortion on the battery case and the post; it
should be without any damage and distortion.
e)
Check
for
abnormal temperature increase on the battery and its connection.
7)
Check and adjust the set
points
of related parameters.
a)
Check the float voltage, equalization voltage, float charging current is normal or not on the
base of technical parameters and site environment. Please handle it in time.
b)
Check the
current
limited charge
is
set correct
ly and
adjust immediately.
c)
Check the alarm voltage
s
(low voltage and over voltage alarm) of the battery
is
set
correct
ly
,
if not, adjust promptly.