- 16 -
0700_GB-Multitast_243
GB
THE SYSTEM "MULTITAST"
Converting to operation
without feeler wheel
1. Remove axle (Pos. 4b)
2. Remove 6 (M14 x 35) screws
3. Swivel the axle bearer around 180° to the rear (4a) and
refit
4. Refit the axle (pos. 4)
5. Aline both rotary units as parallel as possible on even
ground
6. Remove hydraulic cylinder (Hyd) and install accompa-
nying spindle (6)
- Adjust the spindle (6) so that the rotor tines are po-
sitioned as parallel as possible to the ground (A1).
7. Correctly set the distance (X1) using threaded spindle
- see chapter ”Attaching to the Tractor” also.
8. Remove (2) feeler wheel
Converting to operation
with feeler wheel
1. Fit feeler wheel (2)
2. Lower both rotary units onto even ground
3. Remove accompanying spindle (6)
4. Install hydraulic cylinder (Hyd)
5. Correctly set the distance (X1) using threaded spindle
- see chapter ”Attaching to the Tractor” also.