background image

4.0 Legislation

6

© Baxi Heating UK Limited 2010

4.1

Installation, Commissioning, Service & Repair

1. This appliance must be install in accordance with the
manufacturer’s instructions and the regulations in force. Read
the instructions fully before installing or using the appliance.

2. In GB, this must be carried out by a competent person as
stated in the Gas Safety (Installation & Use) Regulations.

3. 

Definition of competence:

A person who works for a Gas

Safe registered company and holding current certificates in the
relevant ACS modules, is deemed competent.

4. IN IE (Eire), this must be carried out by a competent person
as stated in I.S. 813 “Domestic Gas Installations”.

Lifting -

This product should be lifted and handled by two

people. Stooping should be avoided and protective equipment
worn where necessary. Carrying & lifting equipment should be
used as required, e.g. when installing in a loft space.

All Gas Safe registered engineers carry an ID card with their
licence number and a photograph. You can check your
engineer is registered by telephoning 0800 408 5500 or online
at www.GasSafeRegistered.co.uk

The boiler meets the requirements of Statutory Instrument
“The Boiler (Efficiency) Regulations 1993 No 3083” and is
deemed to meet the requirements of Directive 92/42/EEC on
the energy efficiency requirements for new hot water boilers
fired with liquid or gaseous fuels:-

Type test for purpose of Regulation 5 certified by:
Notified Body 0087.

Product/Production certified by:
Notified Body 0086.
Ref: 86-BL-647

For GB/IE only.

4.2

Benchmark Commissioning Checklist

1. Please ensure that the installer has fully completed the
Benchmark Checklist on the inside back pages of the
installation instructions supplied with the product and that you
have signed it to say that you have received a full and clear
explanation of its operation. The installer is legally required to
complete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and
Wales).

2. All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate will
then be issued to the customer who should, on receipt, write
the Notification Number on the Benchmark Checklist.

3. This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer should
complete the relevant Service Record on the Benchmark
Checklist after each service.

4. The Benchmark Checklist may be required in the event of
any warranty work and as supporting documentation relating
to home improvements in the optional documents section of
the Home Information Pack.

Summary of Contents for FSB 30 HE

Page 1: ...er Guide and Important Warranty Information Please keep these instructions in a safe place If you move house please hand them over to the next occupier Promax FSB 30 HE Floor Standing Fanned Flue Condensing Boiler You can rely on ...

Page 2: ...g address The Company Secretary Baxi Heating UK Ltd The Wyvern Business Park Stanier Way Derby DE21 6BF Full acknowledgement of author and source must be given WARNING Any person who does any unauthorised act in relation to a copyright work may be liable to criminal prosecution and civil claims for damages This product has an energy rating A on a scale of A to G For more information see www boiler...

Page 3: ...h for frost protection 1 4 In Operation 1 The Promax FSB 30 HE is a high efficiency condensing boiler In common with other condensing boilers its exceptional efficiency means the flue gases are cooled to such an extent that a plume of water vapour is often visible at the outside flue terminal The amount produced depends on system design product use and outside air temperature but it is not harmful...

Page 4: ...e shut down the boiler see Section 1 2 and consult your Installer as an appliance or system fault is indicated 2 2 Resetting 1 Allow the boiler to cool if hot 2 Hinge down the facia cover 3 Press the Reset Button Fig 3 4 If the boiler will not reset see the LED Fault Indication Label on the inside of the facia cover 5 Further fault finding is described in Section 5 1 Check List Low High Reset Fig ...

Page 5: ...r is installed in a compartment do not use it for storage purposes 6 Flammable materials must not be stored in close proximity to your boiler 7 Avoid skin contact when your boiler is in operation as some surfaces may get hot e g pipework 8 Ensure that the flue terminal outside the house does not become damaged or obstructed particularly by foliage 9 It is important that the condensate drain system...

Page 6: ...ements of Directive 92 42 EEC on the energy efficiency requirements for new hot water boilers fired with liquid or gaseous fuels Type test for purpose of Regulation 5 certified by Notified Body 0087 Product Production certified by Notified Body 0086 Ref 86 BL 647 For GB IE only 4 2 Benchmark Commissioning Checklist 1 Please ensure that the installer has fully completed the Benchmark Checklist on t...

Page 7: ...act your Installer If you have followed the steps in this simple checklist but your boiler still does not operate contact your installer Any repairs to the boiler will usually be the responsibility of the Installer during the warranty period Installer Help line Should your installer need assistance he she can contact our trade support help line for diagnostic and remedy advice If you smell gas Do ...

Page 8: ...annot be repaired or is uneconomic to repair The warranty runs for 12 months from the date your product is installed What this warranty does not cover Repairs to boilers which haven t been installed and commissioned properly and as set out in the installation instructions this includes the need to flush the system effectively and add a suitable corrosion inhibitor Any damage caused by hard water s...

Reviews: