57
INS-2500 • 5403680 • REV C • 04/19
7. Menu Tree 7
Main Menu
5) Settings
1) Network
2) Date/Time
3) Leak Rate
4) Blow Down
5) BMS Test
6) Admin.
Network
1) View IP Settings
2) Learn Network
Date/Time
1) Set Date/Time
2) Sync Date/Time
Leak Rate Screen
Leak Rate: ##
Leak Rate Warning Set Point: ##
Press [ENTER] to Edit
Parameters
Air Tank Blow Down
1) Change Settings
2) Test Blow Down
BMS Test
1) Set Leak Rate
Warning Set Point
2) Set Total Sprinkler
System Capacity
Admin
View IP Settings
Host Name: ##
MAC ID: ##
Subnet Mask: ##
IP Address: ##
Speed: ##
Default Gateway: ##
DNS_Server: ##
Learn Network
Searches for New Devices
on the Network
BMS Relay Test
Relay will Energize
for 30 Seconds
Firmware
Version
Number
Set Leak Rate Warning Set Point Screen
### PSI per 24 hours
Set Total Sprinkler System Capacity
Volume: #### Gallons
Change Settings
Set Air Tank Blow
Down Limits
Test Blow Down
Activates Air Blow
Down for 2 seconds