Using the Composite Railway-Insulator Tester & Software
29
5.1.5.1
Power-On Self-Test (POST) of the Insulator Tester
During the Power-ON Self-Test, the Infrared transmit/receive interfaces are tested to insure that
the two IR receivers can detect the following 2 states:
Presence of infrared on the two IR receivers,
Absence of infrared on the two IR receivers.
This is implemented the following way in this order:
1.
After the memory test (Green LED flashes 4 times), the 2 IR receivers must detect the
presence
of infrared,
2.
Then the sound beeps and the LED will flash Amber up to 10 seconds till the 2 IR
receivers detect the
absence
of infrared.
The operator should manually interrupt the Infrared beams immediately after the start of the
sound to make sure the 2 states of the Infrared are verified. Otherwise, only the “presence of
infrared” state will be verified.
Once the infrared beams have been broken, or after
flashing 10 times, the LED and the tone will turn off.
Once the Insulator Tester has been switched on and the
POST
procedure is finished, communications between
the Probe and the Windows-based software on the
Tablet/Laptop must be tested.
Figure 10
Ensure the slide switch on the Bluetooth
adapter is in the DCE position.
Location of Power
Switch Cover
Slide the Power Switch to the
right to the “ON” position, toward
the DB-9 connector
ON
Locate Power Switch
Cover and remove
Summary of Contents for 3782101C/50
Page 2: ......
Page 4: ......
Page 7: ...1 Chapter 1 General Information ...
Page 8: ...General Information 2 ...
Page 11: ...5 Chapter 2 Overview ...
Page 12: ...Overview 6 ...
Page 17: ...11 Chapter 3 Composite Insulator Tester Elements ...
Page 18: ...Composite Insulator Tester Elements 12 ...
Page 24: ...18 ...
Page 25: ...19 Chapter 4 Windows Based Software ...
Page 26: ...Windows Based Software 20 ...
Page 29: ...23 Chapter 5 Using the Composite Insulator Tester Software ...
Page 30: ...Using the Composite Railway Insulator Tester Software 24 ...
Page 54: ...48 ...
Page 55: ...49 Chapter 6 Interpreting Graphic Results Electric Railway Application ...
Page 56: ...Interpreting Graphic Results Electric Railway Applications 50 ...
Page 64: ...58 ...
Page 65: ...59 Chapter 7 Specifications ...
Page 66: ...Specifications 60 ...
Page 68: ...62 ...
Page 69: ...63 Chapter 8 Important Information ...
Page 70: ...Important Information 64 ...