![Posital Fraba KIT CONTROL BOX WITH GUI Manual Download Page 10](http://html1.mh-extra.com/html/posital-fraba/kit-control-box-with-gui/kit-control-box-with-gui_manual_1582502010.webp)
Manual Kit Control Box with GUI
Page 10
Version: 2020-09-10
MANUAL
KIT CONTROL BOX WITH GUI
Figure 7: Start Calibration CCW direction
3.
The calibration status window will appear. Please wait until the “CCW done”
light turns on. The
execution will take about 3 seconds.
Figure 8: Calibration status windows
4. Run the motor in CW direction. Once motion is established, confirm with
“OK”
button in the pop-
up window.
Figure 9: Start Calibration CW direction
5. After CW direction calibration wass successfully finished
, the “CW done” light in the
status
window will turn on. In the main calibration window,
the “Calibration done” light will turn on. The
calibration is now successfully completed.