background image

ZF3000 

EXTERNAL BLIND INSTALLATION

7. 

In the case of external blinds with manual drive, mark the 

   

place for the opening for the control wire after the 

   

installation of the package

8. 

Uninstall the package, drill a hole with fi 12 drill in the window 

frame or in the wall (depending on the installation type) for the 

control wire and re-install the package into the top rail handle

10. 

In the case of external blinds with manual drive, after 

   

installing the blind package, put the crank pin (1.) in the 

   

manual drive gear by placing it from the inside of the room 

   

through the previously prepared hole in the wall or window 

   

depending on the installation method

   

Screw the manual drive guide (2.) to the wall 

...

4

3. 

The installation place of wall handles should not interfere 

   

with the proper functioning of the blind lifting and lowering 

   

mechanisms (crank, motor). The maximum distance 

   

between the handles should not exceed 800mm

.

5.

Install the top guide handles on the extreme edges of the 

   

top rail

.

6. 

Install the blind package into the open handles in such a way 

   

that the "WINDOW SIDE" label with information about the 

   

installation side is on the window side

.

4. 

Screw the top rail handle to the mounted wall handle. 

max. 800mm

1.

2.

9. 

Close the top rail handles and tighten the screws

.

WINDOW

SIDE

Summary of Contents for ZF3000 C80

Page 1: ...R INSTRUCTIONS FOR INSTALLATION AND SERVICE OF ZF3000 EXTERNAL BLIND ...

Page 2: ......

Page 3: ...XTERNAL BLIND INSTALLATION 1 Tools needed to install the external blind The PORTOS company does not provide screws dowels cables for placing the electrical installation 2 In the case of dimensioning the dimension smallest from the measurements taken is the right dimension Dimensioning ZF3000 external blind aluminium guides installation in the window Dimensioning ZF3000 external blind aluminium gui...

Page 4: ...nside of the room through the previously prepared hole in the wall or window depending on the installation method Screw the manual drive guide 2 to the wall 4 3 The installation place of wall handles should not interfere with the proper functioning of the blind lifting and lowering mechanisms crank motor The maximum distance between the handles should not exceed 800mm 5 Install the top guide handl...

Page 5: ...the roller mechanism in a vertical axis with the winding tape and then tighten the counter screws 1 17 Insert safety plate extensions into previously installed wall handles and screw them 18 Place the extension silencing element onto the lower parts of the extensions 12 Slide the guide handle into the rear wall of the guide and block the handle by tightening the grub screw The maximum distance bet...

Page 6: ...overlap on the facade Wbo height of the safety plate Wz Wo Wp or Wbo INSTALLATION ON THE FACADE Sz So slat overlap on the facade FLUSH MOUNTED Sz window width 2 In the case of dimensioning the dimension smallest from the measurements taken is the right dimension 3 The installation place of wall handles should not interfere with the proper functioning of the blind lifting and lowering mechanisms cr...

Page 7: ... the top rail handle 11 In the case of external blinds with manual drive after installing the blind package put the crank pin 1 in the manual drive gear by placing it from the inside of the room through the previously prepared hole in the wall or window depending on the installation method Screw the manual drive guide 2 to the wall 10 Join the guide with the supplied crank by means of connecting e...

Page 8: ...ght 17 Run the cord through the adjustment screw 1 and lock it using an Allen key Mount the adjustment screw in the lower handle 2 Tighten the nut on the adjustment screw with the key thus tightening the cord Leave some clearance for the proper operation of the mechanism 18 After checking the correctness of the external blind operation set the roller mechanism in a vertical axis with the winding t...

Page 9: ...3000 external blind aluminium guides installation in the window Dimensioning ZF3000 external blind aluminium guides installation on the facade flush mounted Sz So Wz Wo EXPLANATIONS TO DIMENSIONING Sz blind width So hole width Wz blind height Wo hole height Sz So Wz Wo So Wo Wz Wp P P EXPLANATIONS TO DIMENSIONING Sz blind width slat width So hole width Wz blind height Wo hole height Wp package heig...

Page 10: ...lling marked 6 Make a cut for the wall handle hole in the marked places in the safety plate Then cut or break off a piece of metal sheet in the places of mounting handles as shown above 7 Attach the insulation component on the back side of the safety plate E with double sided tape or appropriate adhesive 8 Fasten the guides with the appropriate screws to the window frame 9 Place the safety plate E...

Page 11: ...tion about the installation side is on the window side 14 Screw the bottom end caps to the guide with the 3x16 mm screws included in the set 15 Check the correct installation of the blind adjust if necessary 16 Depending on the height of the safety plate set the safety plate extensions 1 to the correct height and fasten them to the handles using the screws from the inside of the box as shown above...

Page 12: ...opposite direction When the blind is fully open or closed the motor will be automatically stopped by the limit switch Use the scroll wheel on the remote for precise setting the position of the external blind slats In case of noticing that the blind curtain has stopped and the motor is still running stop the motor immediately by pressing the MY button on the remote in the case of a switch with non ...

Page 13: ...product The blind should be cleaned with a soft cloth using generally available cleaning agents The use of pressure washers strong cleaning agents and solvents is forbidden When cleaning the product it is absolutely not advisable to use sharp tools and cleaning agents that cause scratches In the case of cleaning the product it is unconditionally necessary to prevent the possibility of water gettin...

Page 14: ...IONS IS IMPORTANT FOR THE SAFETY OF PERSONS KEEP THESE INSTRUCTIONS 11 PORTOS TR7 spółka z ograniczoną odpowiedzialnością s k PN EN 13659 All of the certificates of the useful properties are available on the website www portos company ...