HARDWARE CONTENTS
(shown actual size)
Mounting
Screw
Qty. 2
Outlet
Box
Screw
Qty. 2
Crossbar
Qty. 1
EE
DD
FF
CC
Hex Nut
Qty. 2
3
SAFETY INFORMATION
AA
BB
Wire
Connector
Qty. 3
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do not
attempt to assemble the product.
Estimated Assembly Time: 20 - 30 minutes
Tools Required for Assembly (not included): Flathead screwdriver, Phillips screwdriver, Pliers,
Wire cutters, Electrical tape, Safety goggles, Ladder and Caulk.
Helpful Tools (not included): Wire strippers
Please read and understand this entire manual before attempting to assemble, operate or install
the product.
WARNING
• RISK OF ELECTRIC SHOCK - Before beginning installation, turn off electricity at the circuit
breaker box or the main fuse box.
• RISK OF FIRE - Use bulbs specified by the markings and/or labels on the fixture.
CAUTION
• For your safety, read instructions completely before beginning installation.
• If in doubt about electrical installation, consult a licensed electrician.
• Turn off electricity to fixture before replacing the bulb(s).
Green Ground
Screw
[preassembled
to Crossbar (GG)]
Qty. 1
GG
Mounting
Ball
Qty. 2
Lowes.com/portfolio