background image

 
 
 

 
 
 
 

Porta-Dock, Inc. 

Summary of Contents for 1265V

Page 1: ...nger upright tube and diagonal braces REF 1 Lay this side member on its side with the corner angles up Slide the leveling legs REF 4 into the side member uprights Secure in place with 1 2 X 3 4 set sc...

Page 2: ...rs and the nylon slide angles are against the uprights as on the other bed cross STEP 4 Assembly may be easier if 2 X 4 s are laid diagonally on the end across the bottom four corners of the lift and...

Page 3: ...to the top cross tube of the anchor side member using a 3 8 fender washer 3 8 washer and 3 8 locknut REF 20 21 22 At corner C slide a rubber stop tube REF 11 onto the cable that is farthest from the u...

Page 4: ...8 X 3 X 3 1 6 U Bolts washers nuts REF 28 21 23 Leave loose at this time STEP 8 Set the bunk assembly REF 12 on the bunk mounting angles With the tabs on the bunk assembly to the outside of the angles...

Page 5: ...When adjusted correctly tighten the top bolts of the braces STEP 10 Place the 2 square caps onto the three uprights that don t have the winch on them and the stub with the gusset under it on the winch...

Page 6: ...12 02 13 U Instructions CURRENT Lifts A3 LIFT INST 1265 V FLB doc PG 6 OF 11...

Page 7: ...E 1 8 76F SIDE BED TUBE RIGHT 1 9 77F SIDE BED TUBE LEFT 1 10 23E LIFT WHEEL 1 11 4517 RUBBER STOP 3 3 12 60300 BUNK MOUNTING ANGLE 4 13 16F BUNK 2 14 20030 DIAGONAL BRACE 4 15 3821 CAP 2 SQUARE GRAY...

Page 8: ...l Cable 1265V 1 5 3319 2 1 2 Nylon Single Pulley 10 6 4317 Brass Spacer Bushing 4 7 5092 Hitch Pin 1 8 8 8 3191 Cable SS 3 16 x 118 1265V 2 9 3193 Cable SS 3 16 x 123 3 4 1265V 2 10 3194 Cable Galv 1...

Page 9: ...12 02 13 U Instructions CURRENT Lifts A3 LIFT INST 1265 V FLB doc PG 9 OF 11 1265V WINCH ANCHOR BED CROSS TUBE...

Page 10: ...12 02 13 U Instructions CURRENT Lifts A3 LIFT INST 1265 V FLB doc PG 10 of 11 1265V SIDE BED TUBE LEFT RIGHT...

Page 11: ...Porta Dock Inc...

Reviews: