12/02/13
U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc
PG. 1 OF 11
PORTA-DOCK, INC.
210A FLB VERTICAL 1265V LIFT W/ GEAR DRIVE WINCH
Thank you for purchasing our product!
Please read these instructions and follow them step by step.*
STEP 1.
Separate and group like parts and fasteners together. Locate the winch side member with the longer upright
tube and diagonal braces
(REF. # 1)
. Lay this side member on its side with the corner angles up. Slide the leveling
legs
(REF. # 4)
into the side member uprights. Secure in place with 1/2" X 3/4” set screws
(REF. # 19)
. Repeat with
the anchor side member.
STEP 2.
Locate the two 2 X 2” X 64 1/2” bottom cross tubes
(REF. # 5)
Using two people stand the side member up
on it’s leveling legs. With one person balancing the side member, bolt the bottom cross tube to the corner angles
using 1/2” X 3” bolts, washers, and nuts
(REF. # 24, 25, & 26)
. Leave nuts finger tight.