17
Filling the system should be carried out as follows:
Disconnect the quick release fittings in the engine bay and
connect the corresponding fittings with those of the filling
system.
Pressure
Scavenge
Switch on the pump. The system will be filled.
The device must run for ten minutes to guarantee that the system
is correctly filled and bled
Warm-up the engine (80°C) and, if required, fill the reservoir to
the maximum level with the filling device attached
The expansion tank cap must be closed throughout the
entire procedure
Summary of Contents for 911 GT3R 2010
Page 1: ...Technical Manual Model 2010...
Page 10: ...7 3 3 Engine power and torque curves...
Page 44: ...41 4 3 Exhaust system 4 3 1 Standard system 4 3 2 Catalytic converter 100 cells...
Page 45: ...42...
Page 79: ...76 rm 6 3 2 4 Trailing a 8 mm Buchse 28 mm Buchse...
Page 107: ...104 r 9 2 1 Front bumper 9 2 Exterio...
Page 108: ...105 9 3 Rear wing P1 P12 Left wing support Gurney 10mm...
Page 139: ...136 10 12 Relay and fuse ass 10 12 1 Fuse holder ignment...
Page 141: ...138 10 12 4 MS4 sensor system...