For Air Baths:

 

1. Never handle the bath by the blower, piping or other equipment.

 

2. Make sure the manifold and airlines are protected when moving the tub into the house.

 

3. An access panel measuring 16" x 14" (406 x 356mm) must be provided for the blower for any future servicing.

 

4. The blower must not be insulated and must have sufficient air space to permit proper operation. Surrounding ambient air  

 

  temperature should be between 72°F and 86°F.

 

5. The heating element on your blower heats the air blown into the tub to prevent the water from cooling too quickly. It will  

 

  not, under any circumstances, reheat or maintain the temperature of bath water.

 

6. The area underneath and around the tub must be cleaned thoroughly before finalizing installation to prevent any particles  

 

  from entering the blower or being blown into the air jets.

 

7. Before filling the tub, clean installation debris and dirt from the interior of the tub. If necessary, use the soft brush  

 

  attachment of a vacuum cleaner.

 

8. Fill tub and test for proper operation and leaks. Note: The blower must be plugged into a GFCI protected outlet.

 

9. The drain supplied must be used. It is part of the Air Bath and the system will not function correctly without it.

List of Required Tools and Supplies

Tools 

Supplies 

 

 

Optional Components (not included):

•  Level 

•  Nails 

 

 

•  Tile Bead Kits (P/N 751755-100)

•  Tape Measure 

•  Putty 

•  Pipe Wrench 

•  Caulking (waterproof) 

 

 

Required Components:

•  Slip Joint Pliers 

•  1 X 4 Stringers  

 

 

•  Drain (included)

•  Screw Driver 

•  Drop Cloth 

 

 

•  Bath Filler (not included)

•  Standard Woodworking Tools 

•  Cement, Plaster, Grout 

•  Personal Safety Equipment 

•  Liquid Nails (Freestanding Modes Only)

•  Caulking Gun

DECK TO C/L OVERFLOW

SPECIFICATIONS

TABLE 1

GENERAL SPECIFICATIONS AIR BATHS - 

DROP IN AND RECESS MODELS

Fore more details, see specification page per model at www.porcher-us.com

*note - on Air Baths the drain included with the tub must be used. The drain outlet is directly under the drain hole in the tub.

2-1/2"
64mm

50 lbs./ft

2

40 lbs./ft

2

48 lbs./ft

2

54 lbs./ft

2

Gallon to
Overflow

Product 

Weight

Weight with

Water / Floor

Loading

Rough-In

Recess

A x C

Cut Out

Pier

G x F

Drain /

Overflow

Description

Tetsu

5-1/2' x 32"

(140 x 813mm)

60525

Tetsu

5-1/2' x 36"

(140 x 914mm)

60545

Lutezia

5-1/2' x 36"

(140 x 914mm)

60645

Archive

 Oval

5-1/2' x 36"

(140 x 914mm)

60745

X 17" (432mm)

Y 10-1/8" (257mm)

Z 7-1/8" (181mm)

X 17-1/4" (438mm)

Y 10" (254mm)

Z 5-1/4" (133mm)

X 17-3/8" (441mm)

Y 10" (254mm)

Z 7" (178mm)

X 17-3/8" (441mm)

Y 9-1/2" (241mm)

Z 6-3/8" (62mm)

64-1/2" x 30-1/2"

(1638 x 775mm)

64-1/2" x 34-1/2"

(1638 x 880mm)

64-1/4" x 34-1/2"

(1630 x 880mm)

Use Template

Provided

66" x 32"

(1677 x 813mm)

66-1/4" x 36-1/4"

(1682 x 920mm)

66" x 36"

(1677 x 914mm)

See Template

Dimensions

-Next Page-

85 lbs.

(39 kg.)

85 lbs.

(39 kg.)

85 lbs.

(39 kg.)

121 lbs.

(55 kg.)

78 gal.

(295 l.)

68 gal.

(260 l.)

84 gal.

(320 l.)

80 gal.

(300 l.)

Summary of Contents for ARCHIVE 60745

Page 1: ...sage System To ensure maximum performance and pleasure from this product please follow the instructions and cautions Porcher 2010 All product names listed herein are trademarks of Porcher unless other...

Page 2: ...ructions Page 9 Under Deck Mounting Instructions Page 10 Electrical Instructions Page 11 Remote Air Blower Location Option Page 12 Free Standing Tubs Page 13 14 Drain Assembly and Installation Instruc...

Page 3: ...void alcohol consumption before or during bathing Alcoholic beverages can cause drowsiness or hyperthermia resulting in loss of consciousness or even drowning WARNING Pregnancy If you are or think you...

Page 4: ...age however they are not warranted against leaks when improperly used or subjected to conditions for which they are not designed 4 Plug the blower into a 110V GFCI outlet Start the blower and check al...

Page 5: ...ional Components not included Level Nails Tile Bead Kits P N 751755 100 Tape Measure Putty Pipe Wrench Caulking waterproof Required Components Slip Joint Pliers 1 X 4 Stringers Drain included Screw Dr...

Page 6: ...b 63 1 2 1613mm Cut Hole Length 9 1 2 241mm Center of Drain 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 14 356mm 14 356mm 1 3 4 44mm 7 1 4 190mm 7 1 4 19...

Page 7: ...7mm 19 1 2 495mm 18 3 4 476mm 16 406mm 21 533mm 18 457mm 3 76mm 55 1397mm 115 95 Tetsu 5 1 2 x 36 1676 x 914mm Model 60545 For Air Baths Add 2 1 2 64mm For Air Baths Add 2 1 2 64mm For Air Baths Add 2...

Page 8: ...waste and overflow assembly is concealed between the walls of the tub eliminating the need for a decorative exposed drain kit Dotted Line Represents Bathing Well Measurements are 13mm and are subject...

Page 9: ...r the drain See the roughing in drawing for suggested opening size shadowed and location dimensions The drain overflow of the bath extends below the bottom of the bath Note that this requires a cutout...

Page 10: ...ng 3 Cut bath deck to your specifications A professional solid surface installer should template product on site for exact cut out dimension 4 Replace the bath deck and secure it into place 5 Apply ad...

Page 11: ...TRIC SHOCK Connect only to a circuit protected by a ground fault circuit interrupter 2 Permit access for servicing blower if equipped as noted 3 All building materials and wiring should be routed away...

Page 12: ...location Electrical connections should be performed by a licensed electrician The blower motor must be located within 12 feet of rigid piping from the bath air manifold This limitation is for the tot...

Page 13: ...y special attention to the spout reach when choosing your fixtures Be careful to ensure the spout will extend out far enough to clear the tub flange and the falling water will not hit too high up on t...

Page 14: ...nter of the room Keep in mind that the placement of the blower can be challenging or problematic All models have a built in access panel for drain installation that you may prefer to place on the less...

Page 15: ...e overflow Recheck the couplings and make certain that they are not leaking Although the couplings are factory tightened and inspected some loosening may have occurred during transit Make sure the air...

Page 16: ...rain from below unit through opening as shown in photo A 5 Apply 3 or 4 pea sized dabs of 100 silicone sealant to bottom waste drain flange and press flat rubber gasket into place as shown in photos B...

Page 17: ...acrylic surface as directed by silicone sealant directions 9 From unit back side overflow nut should be in alignment with overflow opening as shown in photo F 10 Slide air bath fitting nut washer and...

Page 18: ...in overflow assembly pipe per photo O 16 Apply PVC cement to barbed end of 90 degree elbow and insert vertical flex hose over barbs as shown in photo P 17 Align vertical flex hose end of piping with t...

Page 19: ...drain waste hole as shown in photo V 23 The drain stopper should prevent water from draining out of tub when the escutcheon is in the fully counterclockwise position as shown in photo W Adjust the dra...

Page 20: ...infectant spray or concentrate or Lysol Basin Tub and Tile Cleaner Windex Mr Clean Dow Disinfectant Bathroom Cleaner or cleaning products in aerosol cans HARSH CHEMICALS SHOULD NEVER BE USED ON ACRYLI...

Page 21: ...ERATING CHROMATHERAPY DISPLAY COLORS 1ST 2ND 3RD 4TH 5TH 6TH 7TH 8TH 9TH 10TH 11TH WHITE SLOW RAINBOW CYCLE FAST RAINBOW CYCLE TURQUOISE BLUE MAGENTA RED ORANGE YELLOW GREEN RETURN TO SLOW RAINBOW CYC...

Page 22: ...rted with a state of the art self cleaning system and enhanced it with Ever Clean The EverClean antimicrobial system incorporates AlphaSan a patented antimicrobial agent manufactured right into the ai...

Page 23: ...e wave function button will light Blower speed will continuously vary between high and low Press again to exit wave function button light will go out STANDARD DRYING CYCLE An automatic drying cycle wi...

Page 24: ...To turn on Chromatherapy lights press light button once The cycle will start on white Turn off and on within 3 seconds it will change to slow rainbow cycle and so on per the display color table shown...

Page 25: ...e 24H PRO PROGRAMMABLE DRYING CYCLE The system must be stopped prior to activation or deactivation Activation Determine at which time you wish the purge to activate At that precise time press and hold...

Page 26: ...Cleaner Windex Cleaner Mr Clean Cleaner Dow Disinfectant Bathroom Cleaner or other cleaning products in aerosol cans HARSH CHEMICALS SHARP AND ABRASIVE OBJECTS SHOULD NEVER BE USED ON ACRYLIC SURFACES...

Page 27: ...n the owner s manual and use of other than genuine Porcher replacement parts in all cases whether caused by a plumbing contractor service company the owner or any other person 2 Deterioration through...

Reviews: