Carefully uncrate and inspect your new bath for any shipping damage. If such damage is found, report it to your 
vendor immediately. After inspection and during installation, protect the bath from construction damage. Before 
installation, and before enclosing with wallboard, tile, etc., the bath must be filled with water to check for leaks that 
may have resulted from shipping damage or mishandling! Fittings (bath filler, shower arm, etc.) are not provided with 
the bath and must be ordered separately. Framing and enclosing materials are provided by others. Follow test 
procedures carefully.

ATTENTION INSTALLER!

THIS TUB MUST BE TESTED FOR OPERATION AND LEAKS PRIOR TO ENCLOSURE OF SURROUNDING 
AREAS. FAILURE TO DO SO WILL VOID WARRANTY. THIS TUB WAS WATER TESTED AT THE FACTORY AND 
FOUND TO BE FULLY OPERATIONAL AND LEAK FREE PRIOR TO SHIPPING. FREIGHT HANDLING AND JOB 
SITE EXPOSURE MAY HAVE DETERIORATED THE TUB’S CONDITION. IT IS THE RESPONSIBILITY OF THE 
INSTALLER TO THOROUGHLY TEST THE UNIT PRIOR TO INSTALLATION. TUBS ARE INTENDED FOR 
INDOOR USE ONLY.

TEST PROCEDURES:

1.   Place the tub on a flat surface such as a driveway.

2.   Seal the drain with tape.

3.   Fill tub and allow tub to stand for five minutes 

without the blower running.

 Examine all fittings carefully for 

leaks. 

NOTE:

 The overflow is a plumbing device designed to prevent water from reaching a certain level in your 

tub. DO NOT, under any circumstances, tape off or block the overflow in any way. Any controls located above the 
normal water line are designed to be water resistant, not waterproof. The controls will not leak under normal 
usage, however, they are not warranted against leaks when improperly used or subjected to conditions for which 
they are not designed.

4.   Plug the blower into a 110V GFCI outlet. Start the blower and check all fittings for leaks.

5.   Check that all optional equipment is functioning properly and that the features on the tub match exactly what was 

ordered.

6.   

If any leaks or operating problems are discovered, do not complete installation until problems are 

resolved. Porcher will not be responsible for any costs involved with removing or reinstalling the tub, or 
for the costs of any surrounding materials or labor.

If you have installation or warranty questions please do not return the unit to the place of purchase. Call 800-359-3261

Always protect tub from construction damage by using a protective cover. Damage, including chips and scratches 
incurred at the jobsite is excluded from warranty but may be repaired by qualified technician at the owner’s expense. 
Do not stand in the tub or store materials in the tub during construction. Do not store tub in temperatures below 32 
degrees Fahrenheit. Proper waste and overflow installation is the responsibility of the installer. Porcher does not 
warrant leaks associated with improper waste and overflow installation.

Access must be provided to air blower and/or electrical component on your tub. 

The access panel(s) must have a minimum size of 16" x 14" (406 x 356mm) 

for installation and future servicing of the equipment. Porcher, Inc. will not authorize any 

service unless clear access is available. Access from a crawl space or incomplete 

access to all equipment may result in warranty claims being denied.

Check for availability of optional Porcher wall tiling bead (required for recess installation).
Protect all finished surfaces of the bathtub during construction and installation using a drop cloth.

Summary of Contents for ARCHIVE 60745

Page 1: ...sage System To ensure maximum performance and pleasure from this product please follow the instructions and cautions Porcher 2010 All product names listed herein are trademarks of Porcher unless other...

Page 2: ...ructions Page 9 Under Deck Mounting Instructions Page 10 Electrical Instructions Page 11 Remote Air Blower Location Option Page 12 Free Standing Tubs Page 13 14 Drain Assembly and Installation Instruc...

Page 3: ...void alcohol consumption before or during bathing Alcoholic beverages can cause drowsiness or hyperthermia resulting in loss of consciousness or even drowning WARNING Pregnancy If you are or think you...

Page 4: ...age however they are not warranted against leaks when improperly used or subjected to conditions for which they are not designed 4 Plug the blower into a 110V GFCI outlet Start the blower and check al...

Page 5: ...ional Components not included Level Nails Tile Bead Kits P N 751755 100 Tape Measure Putty Pipe Wrench Caulking waterproof Required Components Slip Joint Pliers 1 X 4 Stringers Drain included Screw Dr...

Page 6: ...b 63 1 2 1613mm Cut Hole Length 9 1 2 241mm Center of Drain 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 16 1 4 413mm 14 356mm 14 356mm 1 3 4 44mm 7 1 4 190mm 7 1 4 19...

Page 7: ...7mm 19 1 2 495mm 18 3 4 476mm 16 406mm 21 533mm 18 457mm 3 76mm 55 1397mm 115 95 Tetsu 5 1 2 x 36 1676 x 914mm Model 60545 For Air Baths Add 2 1 2 64mm For Air Baths Add 2 1 2 64mm For Air Baths Add 2...

Page 8: ...waste and overflow assembly is concealed between the walls of the tub eliminating the need for a decorative exposed drain kit Dotted Line Represents Bathing Well Measurements are 13mm and are subject...

Page 9: ...r the drain See the roughing in drawing for suggested opening size shadowed and location dimensions The drain overflow of the bath extends below the bottom of the bath Note that this requires a cutout...

Page 10: ...ng 3 Cut bath deck to your specifications A professional solid surface installer should template product on site for exact cut out dimension 4 Replace the bath deck and secure it into place 5 Apply ad...

Page 11: ...TRIC SHOCK Connect only to a circuit protected by a ground fault circuit interrupter 2 Permit access for servicing blower if equipped as noted 3 All building materials and wiring should be routed away...

Page 12: ...location Electrical connections should be performed by a licensed electrician The blower motor must be located within 12 feet of rigid piping from the bath air manifold This limitation is for the tot...

Page 13: ...y special attention to the spout reach when choosing your fixtures Be careful to ensure the spout will extend out far enough to clear the tub flange and the falling water will not hit too high up on t...

Page 14: ...nter of the room Keep in mind that the placement of the blower can be challenging or problematic All models have a built in access panel for drain installation that you may prefer to place on the less...

Page 15: ...e overflow Recheck the couplings and make certain that they are not leaking Although the couplings are factory tightened and inspected some loosening may have occurred during transit Make sure the air...

Page 16: ...rain from below unit through opening as shown in photo A 5 Apply 3 or 4 pea sized dabs of 100 silicone sealant to bottom waste drain flange and press flat rubber gasket into place as shown in photos B...

Page 17: ...acrylic surface as directed by silicone sealant directions 9 From unit back side overflow nut should be in alignment with overflow opening as shown in photo F 10 Slide air bath fitting nut washer and...

Page 18: ...in overflow assembly pipe per photo O 16 Apply PVC cement to barbed end of 90 degree elbow and insert vertical flex hose over barbs as shown in photo P 17 Align vertical flex hose end of piping with t...

Page 19: ...drain waste hole as shown in photo V 23 The drain stopper should prevent water from draining out of tub when the escutcheon is in the fully counterclockwise position as shown in photo W Adjust the dra...

Page 20: ...infectant spray or concentrate or Lysol Basin Tub and Tile Cleaner Windex Mr Clean Dow Disinfectant Bathroom Cleaner or cleaning products in aerosol cans HARSH CHEMICALS SHOULD NEVER BE USED ON ACRYLI...

Page 21: ...ERATING CHROMATHERAPY DISPLAY COLORS 1ST 2ND 3RD 4TH 5TH 6TH 7TH 8TH 9TH 10TH 11TH WHITE SLOW RAINBOW CYCLE FAST RAINBOW CYCLE TURQUOISE BLUE MAGENTA RED ORANGE YELLOW GREEN RETURN TO SLOW RAINBOW CYC...

Page 22: ...rted with a state of the art self cleaning system and enhanced it with Ever Clean The EverClean antimicrobial system incorporates AlphaSan a patented antimicrobial agent manufactured right into the ai...

Page 23: ...e wave function button will light Blower speed will continuously vary between high and low Press again to exit wave function button light will go out STANDARD DRYING CYCLE An automatic drying cycle wi...

Page 24: ...To turn on Chromatherapy lights press light button once The cycle will start on white Turn off and on within 3 seconds it will change to slow rainbow cycle and so on per the display color table shown...

Page 25: ...e 24H PRO PROGRAMMABLE DRYING CYCLE The system must be stopped prior to activation or deactivation Activation Determine at which time you wish the purge to activate At that precise time press and hold...

Page 26: ...Cleaner Windex Cleaner Mr Clean Cleaner Dow Disinfectant Bathroom Cleaner or other cleaning products in aerosol cans HARSH CHEMICALS SHARP AND ABRASIVE OBJECTS SHOULD NEVER BE USED ON ACRYLIC SURFACES...

Page 27: ...n the owner s manual and use of other than genuine Porcher replacement parts in all cases whether caused by a plumbing contractor service company the owner or any other person 2 Deterioration through...

Reviews: