Diagram 2A

Diagram 2

Diagram 1A

Assembling   .9, 1.5,  2.5  &  3.5  Ton Bulk Bin  

The .9 Ton uses  4 

 Leg  2 1/2

 angles 92

 

long 8 

 Leg Spacers 1 1/4

 angles  43 1/2

 long 8-

X Bracing 1

 flat straps  66

 long  4 

 Leg Pads 5 X 

5 Plate w/tab & 20 

 5/16 x 1

 hex bolts and nuts.

The 1.5, 2.5, & 3.5 use  4 - Legs 2 1/2

 an-

gle 92

 Long, 8 

 Leg Spacers 1 1/4

 angles  51

 

long ,  8-X Bracing 1

 flat straps 75 1/2

  long , 4 

Leg Pads 5 X 5 Plates w/tab & 20- 5/16 X 1

 hex  

bolts and nuts.

Step 1:

Bolt the Leg Pads to the bottom of the legs 

using the 3/8 X 1

 Hex bolts.

Now take 2- Legs and 2

 Leg Spacers and 

2

 X Brace Straps and make a section like diagram 

1, put the angles to the inside of the leg  with the 
angle up, on the top one and angle down on the bot-
tom one. Put the flat strap on the out side of the leg 
angle & use 5 - 5/16 X 1

 hex bolts to fasten in 

place, (finger tighten only).  Assemble 2 sections 
like this. Now with help stand the two sections up 
spaced accordingly facing each other, now add the 
leg spacers and X bracing  between them just like 
Step 1 to form a square.           

Now tighten all 

bolts.

    Cone to Frame  .9, 1.5, 2.5 & 3.5 Diagram-2
Step 2:

With the frame assembled drop the cone 

into the frame from the top. There are tabs welded 
to the legs to bolt the cone into place with. Drill a 
5/16

 hole through the top hole in each tab and bolt 

securely  using the 5/16 X 1

 carriage bolts, (bolt 

from the inside out). Now drill the remaining holes 
and bolt securely using the 5/16 X 1

 carriage bolts. 

These tabs are long enough to reach past the sides 
of the cone and down the slope, you will need to 
bend this part into the cone and drill and bolt into 
place using the 5/16 X 1

 Carriage bolts again from 

the inside out. Diagram 2

Note:

If you are putting together a 

(2.5 Bin for 

Mineral Concentrate)

 or 3.5 Ton Bin you will 

need to install the extra support straps. They are 1

 

X  51 1/4

 long. You will need to put them on the 

lowest bolt of the leg tabs. (2 Per Leg)  They will 
fasten to the slide valve bolts later on in the assem-
bly  (Diagram  & 2A)

Diagram 1

Diagram 1B

Mineral 
  Strap

Mineral 
  Strap

Leg 
Pad

Summary of Contents for PD-1230

Page 1: ...Assembly Instructions 9 1 5 2 5 3 5 Ton Bulk Bin 3 5 Ton 2 5 Ton 1 5 Ton 9 Ton ...

Page 2: ...y facing each other now add the leg spacers and X bracing between them just like Step 1 to form a square Now tighten all bolts Cone to Frame 9 1 5 2 5 3 5 Diagram 2 Step 2 With the frame assembled drop the cone into the frame from the top There are tabs welded to the legs to bolt the cone into place with Drill a 5 16 hole through the top hole in each tab and bolt securely using the 5 16 X 1 carria...

Page 3: ...oles evenly apart Bolt the top section in place using the 5 16 X 1 1 2 hex headed bolts You need to place the seal washers on these bolts put the bolt with the seal washer through from the top put a regular 5 16 washers and nuts on from the bottom Be Careful Not To Over Tighten and Crush the Washer Cover Assembly all bins Diagram 5 Hold the cover opener on the cover so the 2 bolts that are in the ...

Page 4: ...one bolt one to ea side of the ladder using a 5 16 X 1 hex bolt and to the plastic cone using a 5 16 X 1 carriage bolt from the inside out Step 5 Upper Ladder Assembly 2 5 3 5 Ton Diagram 7 There are 2 1 X 6 1 2 straps that mount to the top outside of the 3 5 Ton ladder bolt these on with the bent end down and away from the ladder 90 degrees to ladder Finger tighten with 2 5 16 X 1 hex bolts With ...

Page 5: ...llar run a bead of caulking around the top of the collar to help seal out the rain Bolt the slide valve to the collar using 1 4 X 1 Carriage bolts Use 4 down the sides and 2 on the ends the bolt pattern is marked on the collar of the slide valve If you add the boot with the slide valve use the same bolt pattern to fasten the boot to the valve as you used to fasten the slide valve to the collar the...

Page 6: ...t Strap 0 0 X Braces 1 X 75 1 2 0 0 Angle Braces 1 X 51 0 Angle Braces 1 X 51 0 0 X Braces 1 X 75 1 2 0 0 Angle Braces 1 X 51 0 Legs 2 1 2 Angle X 88 0 0 Angle Up Angle Down Diagram 1 Diagram 2 1 X 15 Angle 70 3 4 70 3 4 in 50 50 Ancor Bolt Pattren for 1 5 2 5 3 5 Ton 53 1 2 53 1 2 in 76 ...

Page 7: ...r Opener 50 94 Lower Ladder 1 X 15 Angle Top Mount Lower Ladder 1 X 6 1 2 Flat Strap 1 X 51 Flat Strap X Braces 1 X 75 1 2 Angle Braces 1 X 51 Hand Rail 1 5 Ton Diagram 2 1 X 15 Angle Cone is 565 Gal is 70 Cubic Ft ...

Page 8: ... Gal 125 Cubic Feet 2 5 Ton Top is 475 Gal 60 Cubic Ft 24 14 11 6 94 28 50 88 26 Diagram 4 Lower Ladder 1 X 15 Angle Top Mount Lower Ladder 1 X 6 1 2 Flat Strap 1 X 51 Flat Strap 0 0 0 0 0 Hand Rails Upper Ladder 26 Tall X Braces 1 X 75 1 2 0 0 Angle Braces 1 X 51 0 Diagram 4 Legs 2 1 2 Angle 0 16 ...

Page 9: ... 0 Cover Opener 14 50 13 6 28 94 50 88 52 Lower Ladder 1 X 15 Angle Top Mount Lower Ladder 1 X 6 1 2 Flat Strap 0 0 0 Upper Ladder 52 Tall Upper Ladder Mount Hand Rails 14 Top 3 5 Ton Top is 995 Gal 125 Cubic Feet Cone is 565 Gal is 70 Cubic Ft ...