Site Preparation
Polycom Digital Signage Server Hardware Setup
Polycom, Inc.
11
Hardware Kit: screws, cone washers, and cage nuts (from left to right)
•
8 (Eight) M5 x 12 flat head screws
•
2 (Two) 10-32 x 3/4” pan head screws
•
22 (Twenty-two) M4 x 4 truss head screws
•
8 (Eight) M5 x 12 cone washers
•
10 (Ten) M5 Cage nuts
The 4-post rack assembly consists of:
•
A set of long, fixed rack brackets that attach directly to the rack itself.
•
A set of medium-sized adjustable rack brackets that attach to the long,
fixed rack brackets.
The 2-post rack assembly consists of:
•
A set of long, fixed rack brackets.
•
Three sets of short rack brackets that attach to the long fixed rack brackets.
One of these sets has threaded holes (for placement in the front) to allow
the appliance to be secured in the rack.
Site Preparation
Setup location, rack and appliance precautions
• Elevated Operating Ambient
- If installed in a closed or multi-unit rack
assembly, the operating ambient temperature of the rack environment
may be greater than room ambient. Therefore, consideration should be
given to installing the equipment in an environment compatible with the
maximum ambient temperature (Tma) specified by the manufacturer.
NOTE
: Use the hardware supplied with your specific rack if different from the
hardware supplied in this kit.