Fig. 8 E39-R8 prism reflector 

 

 

 

 

Fig. 9 Reflector panel 

Summary of Contents for DOP-6001R

Page 1: ...OPTICAL BEAM SMOKE DETECTOR DOP 6001R _________________________________________________________________________________ INSTALLATION AND MAINTENANCE MANUAL IK E343 002GB Edition III ...

Page 2: ... aforementioned standards and other features parameters specified in this manual that are not specified in the mentioned standards are confirmed by the Manufacturer Declaration of Performance has been issued for DOP 6001R beam smoke detector The certificate and the Declaration of Performance can be downloaded from www polon alfa pl Read the manual carefully before the detector assembling and commi...

Page 3: ...ATION 4 DESIGN 5 INSTALLATION 6 OPERATING CONDITIONS AND MAINTENANCE 7 SAFETY CONDITIONS 7 1 Repairs and maintenance 7 2 Works at height 7 3 Anti dusting eye protection 7 4 Eye protection against laser beam operating equipment 8 STORAGE AND TRANSPORT 9 DESIGN RECOMMENDATIONS ...

Page 4: ...arget viewfinder that enables optical path axis alignment between the detector and the reflector reflector panel The DOP 6001R beam smoke detector is intended to interoperate with any fire detection and alarm control panel that ensures power supply in the range between 9 5 V and 28 V and current 100 mA Its alarm signal is the relay non potential contact switch over The detector operates in closed ...

Page 5: ... long time period the detector is equipped with automatic compensation circuits to monitor its contamination and environment impact conditions The circuits ensure the same sensitivity threshold in the whole compensation range At a certain contamination level the detector signals the fault mode denoting a necessity to undertake servicing and cleaning works However even in this mode the detector is ...

Page 6: ...the E39 R8 prism reflector at the operating distance between 5 m and 50 m The reflector or the reflector panel as well as the M42 00 00 00 service kit containing test foils and an adjustment mirror are not included in the detector standard pack and should be ordered separately In case the detector is seen with difficulty or is installed in a hardly accessible place it is possible to connect the WZ...

Page 7: ... detector is properly aligned the green LED should flash every 10 seconds what stands for a proper adjustment of the infrared beam to the distance between the detector and the reflector reflector panel During this adjustment process the detector being connected to a control panel signals a fault mode If the yellow LED flashes after adjustment is completed and the connected control panel still sign...

Page 8: ...OLON ALFA bears no responsibility for the operation of any apparatus being serviced and repaired by unauthorised personnel 7 2 Works at height Any detector installation works carried out at height must be executed with particular care utilising tools and machinery in good working condition Special attention shall be given to the stability of ladders platforms etc Any electric tool shall be used st...

Page 9: ...uld not exceed D value and between two adjacent detector beams 2D The distance from the IR beam to any obstacle e g a wall perpendicular to a side wall shall not be smaller than 0 5 m The beam detector should constantly see the co operating reflector it is necessary to install it in such a way that its optical path is never even temporarily concealed by a moving object or equipment such as cranes ...

Page 10: ...Fig 3 DOP 6001R design and overall dimensions ...

Page 11: ...Fig 4 DOP 6001R detector installation wires connection Fig 5 DOP 6001R detector internal connections and output terminals diagram ...

Page 12: ...ition 50 low sensitivity jumper in position 30 medium sensitivity jumper in position 18 high sensitivity Alarm mode declaration jumper in W1 position supported W2 jumper must be always in place Fig 6 Jumpers for detector operation declaration ...

Page 13: ...Fig 7 DOP 6001R detectors connection in detection line ...

Page 14: ...Fig 8 E39 R8 prism reflector Fig 9 Reflector panel ...

Page 15: ...Fig 10 DOP 6001R detector testing foil with overprints ...

Page 16: ...Fig 11 Reflector panel assembly IK E343 002GB 10 2021 ...

Page 17: ...NOTES ...