DESIGN 

 

The DOP-6001R detector design is shown in Fig. 1 and Fig. 3. The detector casing, made of plastic, embraces 
electronic  circuits  and  optical  elements  of  the  transmitter  and  receiver  as  well  as  a  laser  diode  that 
facilitates  the  detector easy  optical  alignment.  The  lenses  for  infrared  beam  focusing  are  covered  with  a 
detachable filter. On the detector back side a connecting block is mounted, to connect power supply wires 
and four terminal blocks of the PU and PA relay contacts. The detector is fastened to the wall with a metal 
adjustment basis. On the detector front part an optical fibre for illuminating diodes is placed as well as the 
START push button that initiates the detector adjustment process.

 

The illuminating diode colour signals accordingly: 

green  one 

  a  state  of  the  detector  self-adjustment  to  the  detector-reflector/reflector  panel 

distance, when the signal level is too high; 

yellow  one 

  a  state  of  the  detector  self-adjustment  to  the  detector-reflector/reflector  panel 

distance, when signal level is too low; 

 
The  self-adjustment  process  takes  approximately  30  seconds.  When  the  detector  is  correctly  adjusted,  it 
switches to the supervision mode and in case of any error, including wrong self-adjustment, the yellow LED 
flashes every 2 sec. 
 

red one 

 an alarm mode; 

green diode flashing (every 10 seconds) 

 a supervision mode  

 
The  START  push  button  enables  initiation  of  the  detector  adjustment  process  (self-adjustment)  and  the 
detector parameters renewed set-up after optical parts cleaning works.   
 

5    INSTALLATION 

The DOP-6001R detector interoperates with a reflector panel and then its operating distance ranges from 
50 m to 100 m, or with the E39-R8 prism reflector at the operating distance between 5 m and 50 m. The 
reflector  or  the  reflector  panel  as  well  as  the  M42-00  00  00  service  kit,  containing  test  foils  and  an 
adjustment mirror, are not included in the detector standard pack and should be ordered separately. 
In case the detector is seen with difficulty or is installed in a hardly accessible place, it is possible to connect 
the WZ-31 additional operation indicator to be placed in a convenient and visible place.  

Before installation, it is necessary to declare an alarm mode and a sensitivity threshold. The operations are 
executed using appropriate jumpers placed on the back side of the detector casing, pursuant to Fig. 6. One 
of  the  criteria  taken  into  consideration  when  choosing  sensitivity  may  be  the  distance  between  the 
detector and the reflector/reflector panel, and so: 

-

 

for a distance from 5 m to 20 m 

 18 % sensitivity is recommended; 

-

 

for a distance from 20 m to 50 m 

 30 % sensitivity is recommended; 

-

 

for a distance from 50 m to 100 m 

 50 % sensitivity is recommended. 

It is possible to set sensitivity level experimentally: adopting it to a certain environment in the case of the 
detector  difficult  operating  conditions.  The  DOP-6001R  detector  and  the  reflector/reflector  panel  are 
mounted on opposite walls, pillars or other construction elements of the premises. The walls or pillars must 
be  stable  and  vibration-free.  The  detector  adjustment  base  should  be  mounted  on  a  wall  and  the 
reflector/reflector panel - on the opposite wall. The detector should be placed on the adjustment base (Fig. 
3)  after  preliminary  connection  of  the  wires  to  the  connecting  blocks  in  accordance  with  Fig.  4.  The 
detector  should  be  fixed  to  the  basis  with  three  screws  that  are  accessible  from  the  front  side  (after 
removing the cover). Then a 6F22 battery should be connected to the laser viewfinder contacts.  

Summary of Contents for DOP-6001R

Page 1: ...OPTICAL BEAM SMOKE DETECTOR DOP 6001R _________________________________________________________________________________ INSTALLATION AND MAINTENANCE MANUAL IK E343 002GB Edition III ...

Page 2: ... aforementioned standards and other features parameters specified in this manual that are not specified in the mentioned standards are confirmed by the Manufacturer Declaration of Performance has been issued for DOP 6001R beam smoke detector The certificate and the Declaration of Performance can be downloaded from www polon alfa pl Read the manual carefully before the detector assembling and commi...

Page 3: ...ATION 4 DESIGN 5 INSTALLATION 6 OPERATING CONDITIONS AND MAINTENANCE 7 SAFETY CONDITIONS 7 1 Repairs and maintenance 7 2 Works at height 7 3 Anti dusting eye protection 7 4 Eye protection against laser beam operating equipment 8 STORAGE AND TRANSPORT 9 DESIGN RECOMMENDATIONS ...

Page 4: ...arget viewfinder that enables optical path axis alignment between the detector and the reflector reflector panel The DOP 6001R beam smoke detector is intended to interoperate with any fire detection and alarm control panel that ensures power supply in the range between 9 5 V and 28 V and current 100 mA Its alarm signal is the relay non potential contact switch over The detector operates in closed ...

Page 5: ... long time period the detector is equipped with automatic compensation circuits to monitor its contamination and environment impact conditions The circuits ensure the same sensitivity threshold in the whole compensation range At a certain contamination level the detector signals the fault mode denoting a necessity to undertake servicing and cleaning works However even in this mode the detector is ...

Page 6: ...the E39 R8 prism reflector at the operating distance between 5 m and 50 m The reflector or the reflector panel as well as the M42 00 00 00 service kit containing test foils and an adjustment mirror are not included in the detector standard pack and should be ordered separately In case the detector is seen with difficulty or is installed in a hardly accessible place it is possible to connect the WZ...

Page 7: ... detector is properly aligned the green LED should flash every 10 seconds what stands for a proper adjustment of the infrared beam to the distance between the detector and the reflector reflector panel During this adjustment process the detector being connected to a control panel signals a fault mode If the yellow LED flashes after adjustment is completed and the connected control panel still sign...

Page 8: ...OLON ALFA bears no responsibility for the operation of any apparatus being serviced and repaired by unauthorised personnel 7 2 Works at height Any detector installation works carried out at height must be executed with particular care utilising tools and machinery in good working condition Special attention shall be given to the stability of ladders platforms etc Any electric tool shall be used st...

Page 9: ...uld not exceed D value and between two adjacent detector beams 2D The distance from the IR beam to any obstacle e g a wall perpendicular to a side wall shall not be smaller than 0 5 m The beam detector should constantly see the co operating reflector it is necessary to install it in such a way that its optical path is never even temporarily concealed by a moving object or equipment such as cranes ...

Page 10: ...Fig 3 DOP 6001R design and overall dimensions ...

Page 11: ...Fig 4 DOP 6001R detector installation wires connection Fig 5 DOP 6001R detector internal connections and output terminals diagram ...

Page 12: ...ition 50 low sensitivity jumper in position 30 medium sensitivity jumper in position 18 high sensitivity Alarm mode declaration jumper in W1 position supported W2 jumper must be always in place Fig 6 Jumpers for detector operation declaration ...

Page 13: ...Fig 7 DOP 6001R detectors connection in detection line ...

Page 14: ...Fig 8 E39 R8 prism reflector Fig 9 Reflector panel ...

Page 15: ...Fig 10 DOP 6001R detector testing foil with overprints ...

Page 16: ...Fig 11 Reflector panel assembly IK E343 002GB 10 2021 ...

Page 17: ...NOTES ...

Page 18: ......

Reviews: