ENGINE
3.49
CAM CHAIN TENSIONER
INSTALLATION
B
A
1.
Release the ratchet pawl (A) and push the
tensioner plunger (B) all the way into the
tensioner body.
2.
Install the tensioner body with a new gasket and
tighten the bolts.
Tensioner Bolt Torque:
6 ft. lbs. (8 Nm)
3.
Install the spring, new sealing washer, and
tensioner plug.
Tensioner Plug Torque:
17 ft. lbs. (23 Nm)
4.
Slowly rotate engine two to three revolutions and
re-check cam timing.
STATOR, FLYWHEEL AND
STARTER DRIVE
INSTALLATION
NOTE:
The stator, flywheel, starter drive, and recoil
can be assembled with the engine in the frame.
Stator
1.
Apply a light film of grease to the crankshaft seal.
Apply molybdenum disulfide grease or assembly
lubricant to the crankshaft bushing.
2.
Install a new O-Ring in the oil passage recess in
the crankcase.
3.
Apply Crankcase Sealant (
PN 2871557
) or an
equivalent sealer to the stator plate outer surface
and install a new O-Ring.
4.
Install the stator plate being careful not to damage
the seal. Align timing reference marks on the
plate and crankcase. Be sure the plate is fully
seated.
NOTE:
This is a static timing mark. Strobe timing
should be performed after start up.
5.
Torque bolts evenly to specification.
Stator Plate Bolt Torque:
5-6.5 ft. lbs. (7-9 Nm)
6.
Seal stator wire grommet with Crankcase Sealant
(
PN 2871557
) or equivalent sealer.
Flywheel
1.
Install flywheel, washer, and nut. Torque flywheel
to specification.
Flywheel Nut Torque:
58-72 ft. lbs. (78-98 Nm)
Summary of Contents for 6X6
Page 46: ...GENERAL INFORMATION 2 34 NOTES...
Page 66: ...ENGINE 3 20 CYLINDER HEAD EXPLODED VIEW EH42PL EH50PL A EH42PL EH50PL...
Page 288: ...ELECTRICAL 10 22 NOTES...
Page 289: ...ELECTRICAL 10 23 WIRING DIAGRAM SERIES 11 RANGER 2X4...
Page 290: ...ELECTRICAL 10 24 WIRING DIAGRAM SERIES 11 RANGER 2X4...
Page 291: ...ELECTRICAL 10 25 WIRING DIAGRAM SERIES 11 RANGER 4X4 6X6...
Page 292: ...ELECTRICAL 10 26 WIRING DIAGRAM SERIES 11 RANGER 4X4 6X6...